# 2025-01985: Hydro Plant Keeps Flowing Through 2025, No Hiccups

2025-01985, Notice of Authorization for Continued Project Operation; Northern States Power Company, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2025-01-31, effective 2025-01-01 (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2025-01985
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-01985
- Title: Notice of Authorization for Continued Project Operation; Northern States Power Company
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: unknown
- Published: 2025-01-31
- Effective: 2025-01-01
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

Hydro Plant Keeps Flowing Through 2025, No Hiccups

## Summary

Northern States Power Company gets the green light to keep running the Superior Falls Hydroelectric Project through 2025 while waiting for a new license. This means no interruptions in power or operations, and the current rules stay in place until a fresh license is issued. If no new license shows up by the end of 2025, the company’s permission to operate automatically renews, keeping the energy flowing smoothly.

## Effects PRIA read

- Annual authorization to operate in 2025: benefit, low. Northern States Power Company is issued an annual license for the Superior Falls Hydroelectric Project (Project No. 2587) effective January 1, 2025 through December 31, 2025, or until a new license or other disposition is issued. The company is authorized to continue operating the project under the…
- Automatic renewal if no new license by 2025: benefit, low. If a new license (or other disposition) is not issued on or before December 31, 2025, the annual license for Project No. 2587 will be renewed automatically without further order or notice by the Commission pursuant to 18 CFR 16.18(c). This automatic renewal keeps the annual authorization in effect…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2025-01985 on federalregister.gov](https://www.federalregister.gov/documents/2025/01/31/2025-01985/notice-of-authorization-for-continued-project-operation-northern-states-power-company)
- [2025-01985 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-01-31/pdf/2025-01985.pdf)

## Related
- [Previous: 2025-01984, Notice of Availability of the Environmental Assessment for the Proposed Rover P…](https://policyrisk.com/federal-register/2025-01984)
- [Next: 2025-01986, Notice of Authorization for Continued Project Operation; Northern States Power…](https://policyrisk.com/federal-register/2025-01986)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-01985 (as of 2026-06-08).
