# 2025-02713: PG&E to Restore Old Dam Height, Temporarily Taming Rivers

2025-02713, Pacific Gas & Electric Company; Notice of Intent To Prepare an Environmental Assessment, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2025-02-18, effective 2025-06-01 (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2025-02713
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-02713
- Title: Pacific Gas & Electric Company; Notice of Intent To Prepare an Environmental Assessment
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 90 FR 9723
- Published: 2025-02-18
- Effective: 2025-06-01
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

PG&E to Restore Old Dam Height, Temporarily Taming Rivers

## Summary

Pacific Gas & Electric wants to fix the Lower Feeley Lake Dam by restoring its original height and protecting its slope. To do this, they need permission to temporarily reduce water flow from June to November 2025. This affects local communities near the South Yuba and Bear Rivers and could change river conditions for a few months while the work happens.

## Effects PRIA read

- Temporary Lower River Flows for Dam Work: mixed, low. If you live near the South Yuba or Bear Rivers (Auburn, Colfax, Grass Valley, Nevada City), PG&E is asking to lower flows released from the Lower Feeley Dam from a 0.5 cubic-feet-per-second (cfs) target to a 0.4 cfs target, and to lower the allowable minimum flow from 0.2 cfs to 0.1 cfs. The change…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2025-02713 on federalregister.gov](https://www.federalregister.gov/documents/2025/02/18/2025-02713/pacific-gas-and-electric-company-notice-of-intent-to-prepare-an-environmental-assessment)
- [2025-02713 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-02-18/pdf/2025-02713.pdf)

## Related
- [Previous: 2025-02712, Low Head Hydro M 8, LLC; Notice of Preliminary Permit Application Accepted for…](https://policyrisk.com/federal-register/2025-02712)
- [Next: 2025-02716, Combined Notice of Filings #1](https://policyrisk.com/federal-register/2025-02716)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-02713 (as of 2026-06-08).
