# 2025-04048: NRC Tunes Nuclear Valves and Snubbers: Zzz-Worthy Guidelines

2025-04048, Draft NUREG: Guidelines for Inservice Testing at Nuclear Power Plants: Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants, is a Federal Register notice from Nuclear Regulatory Commission published 2025-03-14, effective 2024-08-16; PRIA reads it as touching household money (as of 2026-09-30).

- Canonical: https://policyrisk.com/federal-register/2025-04048
- As of: 2026-09-30
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-04048
- Title: Draft NUREG: Guidelines for Inservice Testing at Nuclear Power Plants: Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants
- Type: Notice
- Agencies: Nuclear Regulatory Commission
- Citation: 90 FR 12184
- Published: 2025-03-14
- Effective: 2024-08-16
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-09-30

## In one line

NRC Tunes Nuclear Valves and Snubbers: Zzz-Worthy Guidelines

## Summary

The Nuclear Regulatory Commission is updating its guidelines for testing pumps, valves, and snubbers at nuclear power plants to keep everything safe and sound. Plant operators and inspectors will need to follow these clearer rules, and the NRC wants your feedback by April 14, 2025. These updates help avoid costly breakdowns and keep nuclear plants running smoothly without surprises.

## Abstract

The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft report entitled NUREG-1482, Revision 4, "Guidelines for Inservice Testing at Nuclear Power Plants: Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants." This report provides a basic understanding of the regulatory basis for pump and valve inservice testing (IST) programs and dynamic restraint (snubbers) examination and testing programs at nuclear power plants. It also provides information regarding the NRC's involvement in the development of the American Society of Mechanical Engineers (ASME) "Operation and Maintenance of Nuclear Power Plants," Division 1, "OM Code: Section IST" (OM Code).

## Effects PRIA read

- Operators and inspectors must follow updated IST guidance: cost, low. The NRC issued Draft NUREG-1482, Revision 4, which updates guidelines for inservice testing (IST) of pumps, valves, and dynamic restraints (snubbers). Plant operators and inspectors will need to follow these clearer rules, and the NRC is accepting public comments on the draft through April 14, 2025.
- Guidance applies to OM Code through 2020 Edition: benefit, low. Draft NUREG-1482, Revision 4, is applicable, unless stated otherwise, to editions and addenda up to and including the 2020 Edition of the ASME OM Code that are incorporated by reference in 10 CFR 50.55a. Licensees using those OM Code editions should expect the guidance in this draft to cover their…
- Expanded code-of-record interval gives licensees flexibility: benefit, medium. The NRC states that, effective August 16, 2024, it amended 10 CFR 50.55a to expand the code of record interval from 10 years (120 months) to two consecutive inservice testing (IST) and inservice inspection (ISI) program intervals to provide more flexibility for nuclear power plant licensees. Draft…

## Related documents

- [2026-19568](https://policyrisk.com/federal-register/2026-19568): Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight, 2026-09-24
- [2026-14341](https://policyrisk.com/federal-register/2026-14341): Modernizing Reactor Licensing, Safety Oversight, and Siting Practices, 2026-07-16
- [2026-13687](https://policyrisk.com/federal-register/2026-13687): Implementation of the National Environmental Policy Act, 2026-07-07
- [2026-12067](https://policyrisk.com/federal-register/2026-12067): Fee Schedules; Fee Recovery for Fiscal Year 2026, 2026-06-16
- [2026-08550](https://policyrisk.com/federal-register/2026-08550): Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles, 2026-05-01
- [2026-08015](https://policyrisk.com/federal-register/2026-08015): Generic Environmental Impact Statement for Licensing of New Nuclear Reactors, 2026-04-24

## Sources
- [2025-04048 on federalregister.gov](https://www.federalregister.gov/documents/2025/03/14/2025-04048/draft-nureg-guidelines-for-inservice-testing-at-nuclear-power-plants-inservice-testing-of-pumps-and)
- [2025-04048 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-03-14/pdf/2025-04048.pdf)

## Related
- [Previous: 2025-04042, Order of Investigation Into Transit Constraints at International Maritime Choke…](https://policyrisk.com/federal-register/2025-04042)
- [Next: 2025-04049, Certain Mobile Electronic Devices; Notice of Commission Determination Not To Re…](https://policyrisk.com/federal-register/2025-04049)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-04048 (as of 2026-09-30).