2025-05311, Texas Connector Pipeline LLC; Notice of Availability of the Environmental Assessment for the Proposed Texas Connector Amendment Project, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2025-03-28, effective Comments must be received in Washington, DC, on or before 5 p.m. Eastern Time on April 21, 2025. (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2025-05311
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-05311
- Title: Texas Connector Pipeline LLC; Notice of Availability of the Environmental Assessment for the Proposed Texas Connector Amendment Project
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 90 FR 14135
- Published: 2025-03-28
- Effective: Comments must be received in Washington, DC, on or before 5 p.m. Eastern Time on April 21, 2025.
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

Texas Pipeline Project Gets Amendment Environmental Review

## Summary

Texas Connector Pipeline LLC is making some smart changes to their pipeline project in Jefferson and Orange Counties, Texas. They’re cutting down the southern pipeline length, boosting power at the northern compressor station, and tweaking the route to respect landowners. These updates aim to save time and money while keeping things running smoothly!

## Effects PRIA read

- Southern Compressor Station Removed: mixed, low. The Southern Compressor Station would not be built; the originally authorized Southern Compressor Station site would be used instead for a laydown yard and access road. This change is part of the Texas Connector Amendment Project in Jefferson and Orange Counties, Texas.
- Southern Pipeline Shortened: benefit, low. The southern pipeline segment would shrink from 7.6 miles to 1.4 miles as part of the Amendment Project in Jefferson and Orange Counties, Texas. This reduces the length of new pipeline authorized in the southern segment.
- Northern Compressor Expanded: cost, medium. The Northern Compressor Station (renamed Orangefield Compressor Station) would increase compression from three natural gas-driven turbine compressors rated at 16,684 horsepower each to four compressors rated at approximately 24,009 horsepower each. The station footprint would shift slightly northwe…
- Northern Pipeline Realigned for Landowners: benefit, low. The northern pipeline segment would increase from 26.6 miles to 29.6 miles and would include alignment and workspace changes to accommodate landowner requests and development within the previously authorized right-of-way. These alignment modifications are part of the Amendment Project in Jefferson…
- Waterway Use and Dredging Planned: cost, medium. Texas Connector proposes to use Big Hill Bayou, Taylor Bayou, and South Mansfield Ferry Road Canal as water access routes, and Big Hill Bayou would require dredging to allow vessel transit. The project explicitly lists these waterways as part of access for construction or operations in Jefferson an…
- KMPL Meter Station Cancelled: mixed, low. The KMPL Meter Station would not be constructed as part of the Amendment Project. This is an explicit change to previously authorized facilities for the Texas Connector Project in Jefferson and Orange Counties, Texas.
- Public Comment Deadline for EA: benefit, low. The Federal Energy Regulatory Commission staff published an Environmental Assessment (EA) for the Amendment Project and invites public comments focusing on environmental effects, alternatives, and mitigation measures. Comments must be received by 5 p.m. Eastern Time on April 21, 2025.

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2025-05311 on federalregister.gov](https://www.federalregister.gov/documents/2025/03/28/2025-05311/texas-connector-pipeline-llc-notice-of-availability-of-the-environmental-assessment-for-the-proposed)
- [2025-05311 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-03-28/pdf/2025-05311.pdf)

## Related
- [Previous: 2025-05310, 3R Valve; Notice of Preliminary Determination of a Qualifying Conduit Hydropowe…](https://policyrisk.com/federal-register/2025-05310)
- [Next: 2025-05312, City of North Little Rock, Arkansas; Notice of Effectiveness of Withdrawal of R…](https://policyrisk.com/federal-register/2025-05312)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-05311 (as of 2026-06-08).