2025-06898, Pacific Gas & Electric Company; Notice of Application for Temporary Flow Modification Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2025-04-22, effective The licensee requests the variance begin immediately upon Commission approval and conclude when Lake Pillsbury storage exceeds 36,000 acre-feet following October 1, 2025, or is superseded by another variance or license amendment. (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2025-06898
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-06898
- Title: Pacific Gas & Electric Company; Notice of Application for Temporary Flow Modification Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 90 FR 16873
- Published: 2025-04-22
- Effective: The licensee requests the variance begin immediately upon Commission approval and conclude when Lake Pillsbury storage exceeds 36,000 acre-feet following October 1, 2025, or is superseded by another variance or license amendment.
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

PG&E Tweaks River Flows: Public Weighs In on Hydro Changes

## Summary

Pacific Gas & Electric wants to temporarily change how much water flows through their Potter Valley Hydroelectric Project on the Eel and Russian Rivers in California. This affects local communities, wildlife, and water users, and the public has until May 16, 2025, to share their thoughts or get involved. No big money changes are mentioned, but the decision could impact water and power management in the area.

## Effects PRIA read

- Lake Pillsbury Storage Reduced by ~20,000 AF: cost, medium. Pacific Gas & Electric says leaving Scott Dam spillway gates open will reduce Lake Pillsbury storage by about 20,000 acre-feet to 56,000 acre-feet. The company requests the variance start immediately on Commission approval and end when storage exceeds 36,000 acre-feet after October 1, 2025 (or if a…
- Scott Dam Flow Releases Changed (20–35 cfs): mixed, medium. The licensee proposes releasing flows below Scott Dam (gage E-2) consistent with a critical water year minimum of 20 cubic feet per second (cfs), though actual releases would likely be closer to the facility minimum of 35 cfs. The variance is requested to begin immediately upon approval and run unt…
- East Branch Russian River Minimums Cut to 25 cfs (Possible 5 cfs): cost, medium. The licensee would reduce minimum flows in the East Branch Russian River (gage E-16) to the dry water year minimum of 25 cfs, with flexibility to further reduce flows to a critical water year requirement of 5 cfs depending on water availability, safety, and temperature. After September 30, 2025, th…
- Eel River Compliance & Monitoring Changes: benefit, low. The licensee requests modifying compliance at the Eel River below Cape Horn Dam (gage E-11) from an instantaneous requirement to a 24-hour average, and includes provisions for water temperature and biological monitoring, environmental mitigation, and monthly consultation during the variance.

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2025-06898 on federalregister.gov](https://www.federalregister.gov/documents/2025/04/22/2025-06898/pacific-gas-and-electric-company-notice-of-application-for-temporary-flow-modification-accepted-for)
- [2025-06898 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-04-22/pdf/2025-06898.pdf)

## Related
- [Previous: 2025-06897, Northwest Pipeline LLC; Notice of Application and Establishing Intervention Dea…](https://policyrisk.com/federal-register/2025-06897)
- [Next: 2025-06917, Sunshine Act Meetings](https://policyrisk.com/federal-register/2025-06917)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-06898 (as of 2026-06-08).