# 2025-06941: FERC Forces Utilities to Team Up on Electric Future

2025-06941, Building for the Future Through Electric Regional Transmission Planning and Cost Allocation, is a Federal Register rule from Energy Department, Federal Energy Regulatory Commission published 2025-04-28, effective 2025-01-06; PRIA reads it as touching household money (as of 2026-10-13).

- Canonical: https://policyrisk.com/federal-register/2025-06941
- As of: 2026-10-13
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-06941
- Title: Building for the Future Through Electric Regional Transmission Planning and Cost Allocation
- Type: Rule
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 90 FR 17692
- Published: 2025-04-28
- Effective: 2025-01-06
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-10-13

## In one line

FERC Forces Utilities to Team Up on Electric Future

## Summary

The Federal Energy Regulatory Commission is making sure electric companies plan together for big, long-term power needs and share the costs fairly. This new rule affects transmission providers and aims to build smarter, cheaper electric grids by January 6, 2025. It’s all about teamwork to keep the lights on and save money for everyone.

## Abstract

In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs.

## Effects PRIA read

- Long-Term Regional Transmission Planning: benefit, medium. Transmission providers must participate in Long-Term Regional Transmission Planning that uses at least three plausible, diverse Long-Term Scenarios and accounts for seven specific categories of factors to identify and evaluate transmission needs and projects. The planning is intended to identify mo…
- No Mandatory Planning for Unenrolled Utilities: mixed, medium. Transmission providers are not required to plan for the long-term transmission needs of non-jurisdictional transmission providers that have not enrolled in the transmission planning region. Voluntary arrangements to include unenrolled non-jurisdictional transmission providers are allowed only if th…
- State-Agreed Cost Allocation Included in Filings: benefit, low. If Relevant State Entities agree on Long-Term Regional Transmission Cost Allocation Method(s) and/or a State Agreement Process during the six-month Engagement Period, transmission providers must include those agreed methods or processes and related state negotiation information in their Order No. 1…
- Consult States Before Amending Cost Methods: benefit, low. Transmission providers must consult Relevant State Entities before amending Long-Term Regional Transmission Cost Allocation Method(s) and/or a State Agreement Process, or amend such methods/processes if Relevant State Entities seek amendment consistent with their chosen method. This consultation re…
- Definition of Relevant State Entities: benefit, low. Relevant State Entities are defined as any state entity responsible for electric utility regulation or siting electric transmission facilities within the state or portion of a state located in the transmission planning region, including entities designated by state law for that purpose. That defini…

## Related documents

- [2026-22946](https://policyrisk.com/federal-register/2026-22946): International Falls Power Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed International Fall…, 2026-11-12
- [2026-22949](https://policyrisk.com/federal-register/2026-22949): GB Energy Park, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Soliciting Comments…, 2026-11-12
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09

## Sources
- [2025-06941 on federalregister.gov](https://www.federalregister.gov/documents/2025/04/28/2025-06941/building-for-the-future-through-electric-regional-transmission-planning-and-cost-allocation)
- [2025-06941 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-04-28/pdf/2025-06941.pdf)

## Related
- [Previous: 2025-07185, Revisions to the Unverified List](https://policyrisk.com/federal-register/2025-07185)
- [Next: 2025-07240, Revocation of Class E Airspace; Pinecreek, MN](https://policyrisk.com/federal-register/2025-07240)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-06941 (as of 2026-10-13).