# 2025-08628: Nuclear project gets permission to pour foundations before full construction approval

2025-08628, US SFR Owner, LLC; Kemmerer Power Station, Unit 1; Exemption, is a Federal Register notice from Nuclear Regulatory Commission published 2025-05-15, effective 2025-04-29 (as of 2026-10-20).

- Canonical: https://policyrisk.com/federal-register/2025-08628
- As of: 2026-10-20
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-08628
- Title: US SFR Owner, LLC; Kemmerer Power Station, Unit 1; Exemption
- Type: Notice
- Agencies: Nuclear Regulatory Commission
- Citation: 90 FR 20692
- Published: 2025-05-15
- Effective: 2025-04-29
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-10-20

## In one line

Nuclear project gets permission to pour foundations before full construction approval

## Summary

The Nuclear Regulatory Commission gave US SFR Owner, LLC a special green light to start certain non-safety construction work at the Kemmerer Power Station before getting the full construction permit. This means they can begin groundwork like driving piles and installing foundations for parts that won’t affect reactor safety. The exemption was granted on May 7, 2025, speeding up early project steps without extra costs for the public.

## Abstract

The U.S. Nuclear Regulatory Commission (NRC) staff has issued an exemption in response to a February 28, 2025 request, as supplemented by letters dated April 7, and April 29, 2025, from TerraPower, LLC (TerraPower), on behalf of its wholly-owned subsidiary US SFR Owner, LLC (USO), for the proposed Kemmerer Power Station, Unit 1 (Kemmerer 1). Specifically, TerraPower, on behalf of USO, requested an exemption that would modify a portion of the definition of construction applicable to the prohibition of construction of production and utilization facilities without an NRC license for the proposed Kemmerer 1. This exemption modifies the definition for the proposed Kemmerer 1 and allows the driving of piles, subsurface preparation, placement of backfill, concrete, or permanent retaining walls within an excavation, installation of foundations, or the in- place assembly, erection, fabrication or testing, which are for structures, systems, and components classified as non-safety-related with no special treatment (NST); the failure of which could cause a reactor scram or actuation of a safety-related system that is located on the proposed energy island prior to receipt of a construction permit and without a limited work authorization.

## Effects PRIA read

No economic effects identified for this document.

## Related documents

- [2026-19568](https://policyrisk.com/federal-register/2026-19568): Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight, 2026-09-24
- [2026-14341](https://policyrisk.com/federal-register/2026-14341): Modernizing Reactor Licensing, Safety Oversight, and Siting Practices, 2026-07-16
- [2026-13687](https://policyrisk.com/federal-register/2026-13687): Implementation of the National Environmental Policy Act, 2026-07-07
- [2026-12067](https://policyrisk.com/federal-register/2026-12067): Fee Schedules; Fee Recovery for Fiscal Year 2026, 2026-06-16
- [2026-08550](https://policyrisk.com/federal-register/2026-08550): Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles, 2026-05-01
- [2026-08015](https://policyrisk.com/federal-register/2026-08015): Generic Environmental Impact Statement for Licensing of New Nuclear Reactors, 2026-04-24

## Sources
- [2025-08628 on federalregister.gov](https://www.federalregister.gov/documents/2025/05/15/2025-08628/us-sfr-owner-llc-kemmerer-power-station-unit-1-exemption)
- [2025-08628 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-05-15/pdf/2025-08628.pdf)

## Related
- [Previous: 2025-08626, SBIC License Issuance](https://policyrisk.com/federal-register/2025-08626)
- [Next: 2025-08630, Goleta Water District; Notice of Preliminary Determination of a Qualifying Cond…](https://policyrisk.com/federal-register/2025-08630)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-08628 (as of 2026-10-20).