# 2025-08835: Maine Hydro Firm Wants Temporary River Flow Adjustments

2025-08835, Great Lakes Hydro America, LLC; Notice of Application for Temporary Water Level and Flow Variance Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2025-05-19, effective 2025-08-01 (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2025-08835
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-08835
- Title: Great Lakes Hydro America, LLC; Notice of Application for Temporary Water Level and Flow Variance Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 90 FR 21297
- Published: 2025-05-19
- Effective: 2025-08-01
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

Maine Hydro Firm Wants Temporary River Flow Adjustments

## Summary

Great Lakes Hydro America wants to temporarily change water levels and flow at their Mattaceunk Hydroelectric Project on Maine’s Penobscot River. These changes could affect local water conditions and folks have until June 11, 2025, to share their thoughts or objections. No big money moves are mentioned, but the public and agencies are invited to weigh in and help shape the decision.

## Effects PRIA read

- Temporary drawdown of reservoir waters: mixed, low. Starting August 1, 2025, the licensee proposes to lower outflows and draw down the Mattaceunk impoundment for up to nine weeks to allow repair and maintenance work, after which the water surface elevation would be raised back to the normal level. The work includes concrete repairs and gate replacem…
- Fishway repairs before 2026 salmon evaluations: benefit, low. The licensee proposes concrete repairs to the upstream fishway, replacement of the sluice gate and roll gate seal, and repairs to fishway trap supports to ensure the fishway remains operable in preparation for Atlantic salmon (Salmo salar) upstream passage evaluations that begin in 2026. The licens…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2025-08835 on federalregister.gov](https://www.federalregister.gov/documents/2025/05/19/2025-08835/great-lakes-hydro-america-llc-notice-of-application-for-temporary-water-level-and-flow-variance)
- [2025-08835 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-05-19/pdf/2025-08835.pdf)

## Related
- [Previous: 2025-08834, Ampersand Gilman Hydro, LP; Notice of Reasonable Period of Time for Water Quali…](https://policyrisk.com/federal-register/2025-08834)
- [Next: 2025-08836, Spencer Mountain Hydropower, LLC; Notice of Revised Procedural Schedule for Env…](https://policyrisk.com/federal-register/2025-08836)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-08835 (as of 2026-06-08).
