2025-09449, Constellation Energy Generation, LLC; Dresden Nuclear Power Station, Units 2 and 3; Draft Supplemental Environmental Impact Statement, is a Federal Register notice from Nuclear Regulatory Commission published 2025-05-30, effective Members of the public are invited to submit comments by July 14, 2025.; PRIA reads it as touching household money (as of 2026-10-26).

- Canonical: https://policyrisk.com/federal-register/2025-09449
- As of: 2026-10-26
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-09449
- Title: Constellation Energy Generation, LLC; Dresden Nuclear Power Station, Units 2 and 3; Draft Supplemental Environmental Impact Statement
- Type: Notice
- Agencies: Nuclear Regulatory Commission
- Citation: 90 FR 23079
- Published: 2025-05-30
- Effective: Members of the public are invited to submit comments by July 14, 2025.
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-10-26

## In one line

Illinois Nuclear Plant Seeks More Time Under Environmental Review

## Summary

Constellation Energy wants to keep running its Dresden Nuclear Power Station, Units 2 and 3, near Joliet, Illinois, for even longer. The Nuclear Regulatory Commission is asking the public to share their thoughts on this plan by July 14, 2025. This decision affects local communities and energy users, with no big cost changes announced yet but important environmental impacts under review.

## Abstract

The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment Draft Supplement 17, Second Renewal, to the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG-1437, regarding the proposed subsequent license renewal (SLR) of Renewed Facility Operating License Nos. DPR-19 and DPR-25, which authorize Constellation Energy Generation, LLC to operate Dresden Nuclear Power Station, Units 2 and 3 (Dresden). Dresden is located 23 miles (mi) southwest of Joliet, Illinois, and 60 mi southwest of Chicago, Illinois, along the Illinois, Des Plaines, and Kankakee Rivers. Possible alternatives to the proposed action of SLR include no action and reasonable replacement power alternatives.

## Effects PRIA read

- Possible 20‑Year Dresden License Extension: mixed, medium. Constellation Energy has applied for a subsequent license renewal (SLR) that would allow Dresden Nuclear Power Station, Units 2 and 3, to operate for an additional 20 years. Dresden is located 23 miles southwest of Joliet, IL and 60 miles southwest of Chicago, IL. The proposal could affect local co…
- NRC Preliminary Finding and Alternatives Analysis: mixed, medium. The NRC issued Draft Supplement 17, Second Renewal, which presents a preliminary analysis and the NRC staff's preliminary recommendation that the adverse environmental impacts of SLR for Dresden are "not so great" as to make preserving the option of subsequent license renewal unreasonable. The draf…
- Public Comment Deadline and Document Access: benefit, low. The NRC invites the public to submit comments by July 14, 2025, on Draft Supplement 17 (Docket ID NRC-2024-0080). The draft is available in the NRC's ADAMS system and for public review at Morris Area Public Library (604 Liberty St., Morris, IL 60450) and Coal City Public Library District (85 N Garf…

## Related documents

- [2026-19568](https://policyrisk.com/federal-register/2026-19568): Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight, 2026-09-24
- [2026-14341](https://policyrisk.com/federal-register/2026-14341): Modernizing Reactor Licensing, Safety Oversight, and Siting Practices, 2026-07-16
- [2026-13687](https://policyrisk.com/federal-register/2026-13687): Implementation of the National Environmental Policy Act, 2026-07-07
- [2026-12067](https://policyrisk.com/federal-register/2026-12067): Fee Schedules; Fee Recovery for Fiscal Year 2026, 2026-06-16
- [2026-08550](https://policyrisk.com/federal-register/2026-08550): Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles, 2026-05-01
- [2026-08015](https://policyrisk.com/federal-register/2026-08015): Generic Environmental Impact Statement for Licensing of New Nuclear Reactors, 2026-04-24

## Sources
- [2025-09449 on federalregister.gov](https://www.federalregister.gov/documents/2025/05/30/2025-09449/constellation-energy-generation-llc-dresden-nuclear-power-station-units-2-and-3-draft-supplemental)
- [2025-09449 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-05-30/pdf/2025-09449.pdf)

## Related
- [Previous: 2025-09448, Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Draf…](https://policyrisk.com/federal-register/2025-09448)
- [Next: 2025-09637, Constellation Energy Generation, LLC; Peach Bottom Atomic Power Station Units 2…](https://policyrisk.com/federal-register/2025-09637)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-09449 (as of 2026-10-26).