# 2025-14172: PG&E to Tweak Rivers for Salmon Survival in California

2025-14172, Pacific Gas and Electric Company; Notice of Intent To Prepare an Environmental Assessment, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2025-07-28, effective The licensee proposes to execute these temporary flow changes as soon as the Commission grants approval and continue them until September 30, 2025. Commission staff plans to issue an environmental assessment by August 6, 2025. (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2025-14172
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-14172
- Title: Pacific Gas and Electric Company; Notice of Intent To Prepare an Environmental Assessment
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 90 FR 35525
- Published: 2025-07-28
- Effective: The licensee proposes to execute these temporary flow changes as soon as the Commission grants approval and continue them until September 30, 2025. Commission staff plans to issue an environmental assessment by August 6, 2025.
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

PG&E to Tweak Rivers for Salmon Survival in California

## Summary

Pacific Gas and Electric Company wants to temporarily change water flow rules in parts of Butte County, California, to help protect salmon and save cold water for later in the summer. This change would last until September 30, 2025, and the government is preparing an environmental check to make sure it’s safe. Local communities, fish lovers, and water users should keep an eye out for updates by early August.

## Effects PRIA read

- West Branch Feather River Flow Cut to 7 cfs: benefit, low. Pacific Gas & Electric asked to temporarily lower the West Branch Feather River instantaneous minimum flow from 15 cubic feet per second (cfs) to 7 cfs for a 48-hour period. If approved, this change could be put into effect as soon as the Commission approves and would run through September 30, 2025.
- Philbrook Creek Flow Reduced to 1–2 cfs: benefit, low. PG&E requested a temporary change to Philbrook Creek's instantaneous minimum flow from 2 cfs to between 1 and 2 cfs for a 48-hour period. The requested modification would take effect upon Commission approval and continue until September 30, 2025.
- Action Aims to Protect Chinook Salmon: benefit, low. The requested temporary variance is intended to preserve cold water in Philbrook Reservoir, increase flow to Butte Creek, and reduce high-temperature effects on Central Valley spring-run Chinook salmon, with the goal of saving water for release later in the summer. Commission staff plans to prepare…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2025-14172 on federalregister.gov](https://www.federalregister.gov/documents/2025/07/28/2025-14172/pacific-gas-and-electric-company-notice-of-intent-to-prepare-an-environmental-assessment)
- [2025-14172 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-07-28/pdf/2025-14172.pdf)

## Related
- [Previous: 2025-14171, Aulander Holloman Solar, LLC; Notice of Institution of Section 206 Proceeding a…](https://policyrisk.com/federal-register/2025-14171)
- [Next: 2025-14173, Eagle Creek Reusens Hydro, LLC; Notice of Intent To Prepare an Environmental As…](https://policyrisk.com/federal-register/2025-14173)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-14172 (as of 2026-06-08).
