# 2025-14175: Boats Face Temporary No-Go Zones Near Houston Bridge Work

2025-14175, Safety Zone; Beltway 8 Bridge Construction, Houston Ship Channel, Houston, TX, is a Federal Register rule from Homeland Security Department, Coast Guard published 2025-07-28, effective 2025-07-28; PRIA reads it as touching household money (as of 2026-11-18).

- Canonical: https://policyrisk.com/federal-register/2025-14175
- As of: 2026-11-18
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-14175
- Title: Safety Zone; Beltway 8 Bridge Construction, Houston Ship Channel, Houston, TX
- Type: Rule
- Agencies: Homeland Security Department; Coast Guard
- Citation: 90 FR 35437
- Published: 2025-07-28
- Effective: 2025-07-28
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: 1625-AA00
- Last updated: 2026-11-18

## In one line

Boats Face Temporary No-Go Zones Near Houston Bridge Work

## Summary

Starting July 28 through October 22, 2025, the Coast Guard is setting up two safety zones around the Beltway 8 Bridge construction over the Houston Ship Channel. Boats and people can’t enter these zones unless the Coast Guard says it’s okay, keeping everyone safe during the bridge work. This affects anyone navigating the channel and helps protect workers and the environment without causing delays or extra costs.

## Abstract

The Coast Guard is establishing two temporary safety zones for navigable waters within a 120-yard radius of points on the north and south shore of the Houston Ship Channel under the Beltway 8 Bridge (Sam Houston Tollway Ship Channel Bridge) overhead construction. The safety zones are needed to protect personnel, vessels, and the marine environment from potential hazards created by constructing a new bridge. Entry of vessels or persons into these zones are prohibited unless specifically authorized by the Captain of the Port, Sector Houston-Galveston.

## Effects PRIA read

- No-Entry Safety Zones During Bridge Work: cost, low. From July 24, 2025 through October 22, 2025, all boats and people are prohibited from entering the safety zones that cover navigable waters within a 120-yard radius of the Beltway 8 bridge construction at coordinates 29°44.233' N, 95°8.767' W (north shore) and 29°44.067' N, 95°8.783' W (south shore…
- Must Request Permission to Enter Zones: cost, low. If you want to enter or transit the safety zones during July 24, 2025 through October 22, 2025, you must request permission from the Captain of the Port on VHF-FM channel 16 or by telephone at 866-539-8114, and comply with any lawful orders from the COTP or designated representatives. Designated re…
- Coast Guard Certifies Minimal Economic Impact: benefit, low. The Coast Guard certified under the Regulatory Flexibility Act that this temporary rule will not have a significant economic impact on a substantial number of small entities, noting the zones affect only small 120-yard radius areas and will have minimal impact on vessel navigation.

## Related documents

- [2026-20087](https://policyrisk.com/federal-register/2026-20087): Clarification of Certain Mariner Training Requirements, 2026-10-01
- [2026-13137](https://policyrisk.com/federal-register/2026-13137): Marine Casualty Reporting on the Outer Continental Shelf, 2026-06-30
- [2026-08699](https://policyrisk.com/federal-register/2026-08699): Shipping Safety Fairways Along the Atlantic Coast, 2026-05-05
- [2026-23405](https://policyrisk.com/federal-register/2026-23405): Safety Zone; Monongahela River, Pittsburgh, PA, 2026-11-17
- [2026-23304](https://policyrisk.com/federal-register/2026-23304): Safety Zone; Huron River, Huron, OH, 2026-11-16
- [2026-23230](https://policyrisk.com/federal-register/2026-23230): Special Local Regulation: Marine Events Within the Captain of the Port Miami, Seminole Hard Rock Winterfest Holiday Boat Parade, 2026-11-16

## Sources
- [2025-14175 on federalregister.gov](https://www.federalregister.gov/documents/2025/07/28/2025-14175/safety-zone-beltway-8-bridge-construction-houston-ship-channel-houston-tx)
- [2025-14175 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-07-28/pdf/2025-14175.pdf)

## Related
- [Previous: 2025-14147, Fee Schedules; Fee Recovery for Fiscal Year 2025](https://policyrisk.com/federal-register/2025-14147)
- [Next: 2025-14188, Final Waiver and Extension of the Project Period With Funding for Arts in Educa…](https://policyrisk.com/federal-register/2025-14188)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-14175 (as of 2026-11-18).
