# 2025-14304: Grid Equipment Must Learn to Ride Through Electrical Disturbances

2025-14304, Reliability Standards for Frequency and Voltage Protection Settings and Ride-Through for Inverter-Based Resources, is a Federal Register rule from Energy Department, Federal Energy Regulatory Commission published 2025-07-29, effective 2025-08-28; PRIA reads it as touching household money (as of 2026-11-18).

- Canonical: https://policyrisk.com/federal-register/2025-14304
- As of: 2026-11-18
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-14304
- Title: Reliability Standards for Frequency and Voltage Protection Settings and Ride-Through for Inverter-Based Resources
- Type: Rule
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 90 FR 35599
- Published: 2025-07-29
- Effective: 2025-08-28
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-11-18

## In one line

Grid Equipment Must Learn to Ride Through Electrical Disturbances

## Summary

Starting August 28, 2025, power plants using inverter-based tech and certain wind and synchronous generators must follow new rules to keep the electric grid steady during voltage and frequency changes. These rules make sure equipment can 'ride through' disturbances without shutting down, boosting reliability. Operators should get ready for updated settings and paperwork, with no big costs expected but big benefits for keeping lights on!

## Abstract

The Federal Energy Regulatory Commission (Commission) approves proposed Reliability Standard PRC-024-4 (Frequency and Voltage Protection Settings for Synchronous Generators, Type 1 and Type 2 Wind Resources, and Synchronous Condensers), Reliability Standard PRC-029-1 (Frequency and Voltage Ride-through Requirements for Inverter-Based Resources), and a definition of "Ride-through," which the North American Electric Reliability Corporation (NERC) submitted in response to a Commission directive. In addition, the Commission directs NERC to clarify documentation requirements for legacy equipment needed to support an exemption request pursuant to Reliability Standard PRC-029- 1; to consider whether, and if so how, to address a total of two exception- and exemption-related issues raised by commenters; and to submit an informational filing that assesses the reliability impact of the exemptions to Reliability Standard PRC-029-1.

## Effects PRIA read

- New ride-through rules take effect Aug 28, 2025: benefit, high. Starting August 28, 2025, the Federal Energy Regulatory Commission approved Reliability Standards PRC-024-4 and PRC-029-1 that apply to inverter-based resources (IBRs), type 1 and type 2 wind resources, synchronous generators, and synchronous condensers. The Commission found these standards improve…
- Technical ride-through requirements for IBR owners: cost, medium. Generator owners of NERC-registered inverter-based resources must ensure their IBRs meet the ride-through voltage and frequency criteria in PRC-029-1 (the "must Ride-through zone"), including voltage tables with minimum ride-through times (up to four deviations within a cumulative 10-second measure…
- Limited exemption path for legacy IBRs with hardware limits: mixed, medium. PRC-029-1 allows generator owners of legacy IBRs that are in-service by the effective date to request an exemption from parts of Requirements R1–R3 if known hardware limitations prevent meeting the Ride-through criteria. To obtain an exemption, the generator owner must document the hardware limitat…
- No delayed compliance for new projects; NERC must review exceptions: cost, medium. The final rule states that future IBR projects must fully satisfy the ride-through performance requirements (they cannot rely on later compliance dates), and directs NERC to consider within 12 months whether to address two commenter-raised issues (certain HVDC-connected IBRs and long-lead time proj…

## Related documents

- [2026-23439](https://policyrisk.com/federal-register/2026-23439): Combined Notice of Filings #1, 2026-11-18
- [2026-23443](https://policyrisk.com/federal-register/2026-23443): Commission Information Collection Activities (FERC-510); Comment Request; Extension, 2026-11-18
- [2026-23361](https://policyrisk.com/federal-register/2026-23361): Eastern Shore Natural Gas Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Delmar Regional En…, 2026-11-17
- [2026-23362](https://policyrisk.com/federal-register/2026-23362): Combined Notice of Filings, 2026-11-17
- [2026-23360](https://policyrisk.com/federal-register/2026-23360): Combined Notice of Filings #1, 2026-11-17
- [2026-23133](https://policyrisk.com/federal-register/2026-23133): Combined Notice of Filings #2, 2026-11-13

## Sources
- [2025-14304 on federalregister.gov](https://www.federalregister.gov/documents/2025/07/29/2025-14304/reliability-standards-for-frequency-and-voltage-protection-settings-and-ride-through-for)
- [2025-14304 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-07-29/pdf/2025-14304.pdf)

## Related
- [Previous: 2025-14296, Special Local Regulation; Olympia Harbor Days Tugboat Races, Budd Inlet, WA](https://policyrisk.com/federal-register/2025-14296)
- [Next: 2025-14315, Designation of Areas for Air Quality Planning Purposes](https://policyrisk.com/federal-register/2025-14315)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-14304 (as of 2026-11-18).