# 2025-14593: Eight Years Later, Federal Rules Notice the Drawbridge Is Gone

2025-14593, Drawbridge Operation Regulation; Southern Branch of the Elizabeth River, Chesapeake, Virginia, is a Federal Register rule from Homeland Security Department, Coast Guard published 2025-08-01, effective 2025-08-01 (as of 2026-11-19).

- Canonical: https://policyrisk.com/federal-register/2025-14593
- As of: 2026-11-19
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-14593
- Title: Drawbridge Operation Regulation; Southern Branch of the Elizabeth River, Chesapeake, Virginia
- Type: Rule
- Agencies: Homeland Security Department; Coast Guard
- Citation: 90 FR 36109
- Published: 2025-08-01
- Effective: 2025-08-01
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: 1625-AA09
- Last updated: 2026-11-19

## In one line

Eight Years Later, Federal Rules Notice the Drawbridge Is Gone

## Summary

The Coast Guard is officially removing old rules for the Dominion Boulevard drawbridge in Chesapeake, Virginia, because the drawbridge was replaced by a fixed bridge back in 2016. This change means no more drawbridge openings or related regulations are needed, making life simpler for boaters and drivers alike. The update takes effect August 1, 2025, and won’t cost anyone extra or cause delays.

## Abstract

The Coast Guard is removing the existing drawbridge operation regulation for the Dominion Boulevard (US17) Bridge, mile 8.8 across the Southern Branch of the Elizabeth River in Chesapeake, VA. The Dominion Boulevard (US17) Drawbridge has been removed in its entirety and replaced with a high-level fixed bridge as of October 20, 2016. The operating regulation for the bridge is no longer applicable or necessary and will be removed from the CFR.

## Effects PRIA read

- Obsolete Drawbridge Rule Removed: benefit, low. The Coast Guard is removing the drawbridge operating rule at 33 CFR 117.997(f) because the Dominion Boulevard (US17) drawbridge was replaced with a high-level fixed bridge as of October 20, 2016. The removal takes effect August 1, 2025, and the agency says it will not affect waterway or land traffi…

## Related documents

- [2026-20087](https://policyrisk.com/federal-register/2026-20087): Clarification of Certain Mariner Training Requirements, 2026-10-01
- [2026-13137](https://policyrisk.com/federal-register/2026-13137): Marine Casualty Reporting on the Outer Continental Shelf, 2026-06-30
- [2026-08699](https://policyrisk.com/federal-register/2026-08699): Shipping Safety Fairways Along the Atlantic Coast, 2026-05-05
- [2026-23452](https://policyrisk.com/federal-register/2026-23452): Safety Zone; Mississippi River, New Orleans, LA, 2026-11-18
- [2026-23405](https://policyrisk.com/federal-register/2026-23405): Safety Zone; Monongahela River, Pittsburgh, PA, 2026-11-17
- [2026-23215](https://policyrisk.com/federal-register/2026-23215): Safety Zone; FRL Inaugural Invitational eFoil Exhibition Race, Miami Marine Stadium Basin, Miami, FL, 2026-11-16

## Sources
- [2025-14593 on federalregister.gov](https://www.federalregister.gov/documents/2025/08/01/2025-14593/drawbridge-operation-regulation-southern-branch-of-the-elizabeth-river-chesapeake-virginia)
- [2025-14593 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-08-01/pdf/2025-14593.pdf)

## Related
- [Previous: 2025-14579, Amendment of Class D and E Airspace Over Hickory and Morganton, NC](https://policyrisk.com/federal-register/2025-14579)
- [Next: 2025-14618, Remove Regulations for Sulphur Operations](https://policyrisk.com/federal-register/2025-14618)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-14593 (as of 2026-11-19).
