# 2025-14886: Nuclear license paperwork advances under the reassuring banner of no hazards

2025-14886, Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, is a Federal Register notice from Nuclear Regulatory Commission published 2025-08-06, effective This monthly notice includes all amendments issued, or proposed to be issued, from June 19, 2025, to July 17, 2025. Comments must be filed by September 5, 2025. A request for a hearing or petitions for leave to intervene must be filed by October 6, 2025.; PRIA reads it as touching household money (as of 2026-11-20).

- Canonical: https://policyrisk.com/federal-register/2025-14886
- As of: 2026-11-20
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-14886
- Title: Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
- Type: Notice
- Agencies: Nuclear Regulatory Commission
- Citation: 90 FR 37891
- Published: 2025-08-06
- Effective: This monthly notice includes all amendments issued, or proposed to be issued, from June 19, 2025, to July 17, 2025. Comments must be filed by September 5, 2025. A request for a hearing or petitions for leave to intervene must be filed by October 6, 2025.
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-11-20

## In one line

Nuclear license paperwork advances under the reassuring banner of no hazards

## Summary

The Nuclear Regulatory Commission is sharing updates on changes to nuclear plant licenses that don’t pose big safety risks. These updates affect plant operators and the public, with a chance to comment or request hearings by early October 2025. No major cost or safety issues are expected, and the changes keep plants running smoothly and safely.

## Abstract

Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular monthly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person.

## Effects PRIA read

- Public comment and hearing deadlines: benefit, low. You can submit comments on the proposed license amendments listed in this notice by September 5, 2025. If you want a hearing or to intervene, you must file a request or petition by October 6, 2025; the notice covers amendment requests from June 19, 2025, to July 17, 2025.
- Expedited license amendment issuance to avoid shutdown: benefit, medium. The NRC can make a license amendment immediately effective if it determines the amendment involves no significant hazards consideration (NSHC). The Commission may also issue amendments before the 60-day notice period or before the 30-day comment period ends if failing to act would result in deratin…
- Temporary higher heat-sink temperature allowance: benefit, low. An issued amendment for Braidwood Station, Units 1 and 2, allows an ultimate heat sink temperature of less than or equal to 102.8 degrees Fahrenheit until September 30, 2025.
- Diesel fuel requirements changed to duration-based: benefit, medium. An issued amendment for the Donald C. Cook Nuclear Plant revised technical specifications by removing numeric stored diesel fuel and lube oil volume requirements and replacing them with duration-based diesel operating time requirements.

## Related documents

- [2026-19568](https://policyrisk.com/federal-register/2026-19568): Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight, 2026-09-24
- [2026-14341](https://policyrisk.com/federal-register/2026-14341): Modernizing Reactor Licensing, Safety Oversight, and Siting Practices, 2026-07-16
- [2026-13687](https://policyrisk.com/federal-register/2026-13687): Implementation of the National Environmental Policy Act, 2026-07-07
- [2026-12067](https://policyrisk.com/federal-register/2026-12067): Fee Schedules; Fee Recovery for Fiscal Year 2026, 2026-06-16
- [2026-08550](https://policyrisk.com/federal-register/2026-08550): Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles, 2026-05-01
- [2026-08015](https://policyrisk.com/federal-register/2026-08015): Generic Environmental Impact Statement for Licensing of New Nuclear Reactors, 2026-04-24

## Sources
- [2025-14886 on federalregister.gov](https://www.federalregister.gov/documents/2025/08/06/2025-14886/monthly-notice-applications-and-amendments-to-facility-operating-licenses-and-combined-licenses)
- [2025-14886 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-08-06/pdf/2025-14886.pdf)

## Related
- [Previous: 2025-14882, Butyl Benzyl Phthalate (BBP); Diisobutyl Phthalate (DIBP); Draft Risk Evaluatio…](https://policyrisk.com/federal-register/2025-14882)
- [Next: 2025-14888, Notice of Availability, Notice of Public Comment Period, Notice of Public Meeti…](https://policyrisk.com/federal-register/2025-14888)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-14886 (as of 2026-11-20).