2025-17575, Village of Swanton, Vermont; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2025-09-11, effective Deadline for filing motions to intervene, protests, comments, recommendations, terms, conditions, and prescriptions: November 7, 2025 by 5:00 p.m. Eastern Time. Deadline for filing reply comments: December 22, 2025 by 5:00 p.m. Eastern Time. Final amendments to the application must be filed on or before October 8, 2025 by 5:00 p.m. Eastern Time. (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2025-17575
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-17575
- Title: Village of Swanton, Vermont; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 90 FR 44058
- Published: 2025-09-11
- Effective: Deadline for filing motions to intervene, protests, comments, recommendations, terms, conditions, and prescriptions: November 7, 2025 by 5:00 p.m. Eastern Time. Deadline for filing reply comments: December 22, 2025 by 5:00 p.m. Eastern Time. Final amendments to the application must be filed on or before October 8, 2025 by 5:00 p.m. Eastern Time.
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

Vermont Village Dams Up for Hydro License Comments

## Summary

The Village of Swanton, Vermont, is applying for a new license to run the Highgate Falls Hydroelectric Project on the Missisquoi River. This means local folks and energy users might see changes in how power is made and managed, with the government now reviewing the project’s environmental impact. If you want to speak up or get involved, you’ve got until November 7, 2025, to send in your comments or protests.

## Effects PRIA read

- Dam operation and flow rules: benefit, medium. The project would change how the dam is run: run-of-river mode with a 3-inch impoundment fluctuation from March 31 through June 15; peaking mode from June 16 through March 30 with a maximum 24-inch drawdown (reduced from 30 inches); refill within 8 hours after each drawdown. Minimum flows would be…
- Local recreation access and safety upgrades: benefit, low. The project would add or improve recreation access and safety: improve an existing parking area for 5 to 7 cars, develop access for hand-carry watercraft to the impoundment and downstream areas, install a warning system to alert recreation users to flow increases, and develop a recreational mainten…
- Onsite electric vehicle charging added: benefit, low. The Village proposes to install an electric vehicle charging station that can serve 5 vehicles at the project site. This adds local EV charging access near the dam and impoundment area.
- Public comment and intervention deadlines: benefit, low. The public may file motions to intervene, protests, comments, recommendations, terms, conditions, and prescriptions by November 7, 2025 by 5:00 p.m. Eastern Time. Reply comments are due December 22, 2025 by 5:00 p.m. Eastern Time, and final amendments must be filed by October 8, 2025 by 5:00 p.m. E…
- Environmental protection and cultural plans required: benefit, low. The Village proposes to develop several protection plans: a freshwater mussel plan (relocation during drawdowns and mussel surveys every 5 years), a plan to protect horn‑leaved riverweed downstream of Swanton Dam ledges, a historic properties management plan, and a post‑licensing evaluation of fish…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2025-17575 on federalregister.gov](https://www.federalregister.gov/documents/2025/09/11/2025-17575/village-of-swanton-vermont-notice-of-application-accepted-for-filing-soliciting-motions-to-intervene)
- [2025-17575 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-09-11/pdf/2025-17575.pdf)

## Related
- [Previous: 2025-17574, Appalachian Power Company; Notice of Application Accepted for Filing and Solici…](https://policyrisk.com/federal-register/2025-17574)
- [Next: 2025-17576, GR Catalyst Two, LLC; Notice of Revised Procedural Schedule](https://policyrisk.com/federal-register/2025-17576)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-17575 (as of 2026-06-08).