# 2025-18315: Georgia's Pumped Storage Hydro Project: Public Weighs In on Eco Impacts

2025-18315, Oglethorpe Power Corporation; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Rocky Mountain Pumped Storage Hydroelectric Project, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2025-09-22, effective 2025-10-20 (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2025-18315
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-18315
- Title: Oglethorpe Power Corporation; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Rocky Mountain Pumped Storage Hydroelectric Project
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 90 FR 45380
- Published: 2025-09-22
- Effective: 2025-10-20
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

Georgia's Pumped Storage Hydro Project: Public Weighs In on Eco Impacts

## Summary

Oglethorpe Power Corporation wants to renew its license for the Rocky Mountain Pumped Storage Hydroelectric Project in Floyd County, Georgia. The government is asking the public to share their thoughts on how this project might affect the environment before making a decision. This is a chance for everyone to help shape the future of local energy and nature, with comments needed soon to keep things moving.

## Effects PRIA read

- Public comment window opens (Oct 20, 2025): benefit, low. The Federal Energy Regulatory Commission opened a scoping period and requests written public comments on the environmental scope of the Rocky Mountain Pumped Storage Project. Submit comments so the Commission receives them by 5:00 p.m. Eastern Time on October 20, 2025 to ensure they are considered…
- Project to keep 904 MW generation unchanged: benefit, medium. Oglethorpe Power proposes to continue operating the Rocky Mountain Pumped Storage Project in Floyd County, Georgia, as it has historically with no changes to generation capacity; the facility has a combined installed capacity of 904 megawatts. That means the project would continue producing electri…
- Minimum release of 1.2 cfs maintained; flow study planned: benefit, low. Under the proposed license, Oglethorpe Power would continue releasing a continuous minimum flow of 1.2 cubic feet per second (cfs) from the Lower Reservoir into Heath Creek, and would implement a study of different minimum flows during summer low-flow operations to examine effects on dissolved oxyg…
- Bald eagle and invasive species management plans: benefit, low. OPC proposes to implement a Bald Eagle Management Plan and an Invasive Species Management Plan as part of the new license for the Rocky Mountain project. These plans aim to protect bald eagles and manage invasive species at the project site.
- Bat habitat protection measures proposed: benefit, low. The license applicant proposes to implement bat habitat protection measures at the Rocky Mountain Project as part of its proposed protections.
- Recreation Enhancement Plan for local lakes: benefit, low. OPC proposes a Recreation Enhancement Plan for Heath Lake and Antioch Lakes East and West as part of the new license, which is intended to enhance recreational opportunities at those reservoirs.
- Historic Properties Management Plan to be developed: benefit, low. OPC proposes to develop and implement a Historic Properties Management Plan through a Programmatic Agreement as part of relicensing the Rocky Mountain Project, addressing historic property protection at the site.

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2025-18315 on federalregister.gov](https://www.federalregister.gov/documents/2025/09/22/2025-18315/oglethorpe-power-corporation-notice-of-scoping-period-requesting-comments-on-environmental-issues)
- [2025-18315 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-09-22/pdf/2025-18315.pdf)

## Related
- [Previous: 2025-18314, Pine Prairie Energy Center, LLC; Notice of Scoping Period Requesting Comments o…](https://policyrisk.com/federal-register/2025-18314)
- [Next: 2025-18316, Semiannual Regulatory Agenda](https://policyrisk.com/federal-register/2025-18316)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-18315 (as of 2026-06-08).
