# 2025-21670: NJ Railroad Bridge Ditches Four-Hour Wait, Opens on Demand for Boats

2025-21670, Drawbridge Operation Regulation; Passaic River, Between the City of Newark and Town of Kearny, NJ, is a Federal Register proposed rule from Homeland Security Department, Coast Guard published 2025-12-01 (as of 2026-06-11).

- Canonical: https://policyrisk.com/federal-register/2025-21670
- As of: 2026-06-11
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2025-21670
- Title: Drawbridge Operation Regulation; Passaic River, Between the City of Newark and Town of Kearny, NJ
- Type: Proposed Rule
- Agencies: Homeland Security Department; Coast Guard
- Citation: 90 FR 55063
- Published: 2025-12-01
- Effective: unknown
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: 1625-AA09
- Last updated: 2026-06-11

## In one line

NJ Railroad Bridge Ditches Four-Hour Wait, Opens on Demand for Boats

## Summary

The Coast Guard wants to update how the Point No Point Railroad Bridge between Newark and Kearny, NJ, operates. Instead of needing a four-hour heads-up, the bridge will open right away when a boat signals, thanks to remote control from Mount Laurel, NJ. This change helps boaters and trains move more smoothly without extra waiting, and folks can share their thoughts by December 31, 2025.

## Abstract

The Coast Guard proposes to modify the operating regulation that governs the Point No Point Railroad Bridge across the Passaic River, mile 2.6, between the City of Newark and Town of Kearny, NJ. The proposed change in the regulation will allow the bridge to be remotely operated from the Conrail North Jersey Dispatch Center in Mount Laurel, NJ. This proposed change will alter the operating schedule of the bridge to open on signal and no longer require a four-hour advance notice. We invite your comments on this proposed rulemaking.

## Effects PRIA read

- Bridge Opens On Signal — No 4‑Hour Notice: benefit, low. The Point No Point Railroad Bridge will be remotely operated from Mount Laurel, NJ and will open on signal instead of requiring a four-hour advance notice. This change applies to requests made by sound/visual signals, radio, or phone as described in the rule.
- Opening Delay Limited to 10 Minutes: benefit, low. After a signal to open is given, the rule limits any delay to no more than ten minutes. That means once you request the bridge, an opening may be delayed by at most ten minutes.
- Required Remote Surveillance & Radios: benefit, low. Remote operation must include eight camera views (four marine, four rail), marine radar, sonar, AIS sensors, integration software, a dedicated phone line, and VHF‑FM radiotelephone communications on channels 13 and 16. The system must provide equal or greater visibility and communications compared…
- How You Request an Opening (PTT, Phone, Signals): benefit, low. Vessels must request openings using the methods in 33 CFR 117.15(b)–(d), by telephone at (856) 231-2301, or by push‑to‑talk (PTT) on VHF‑FM channel 13. If using PTT on channel 13, vessels may push the PTT button five times and the remote dispatcher will receive and respond.
- Remote System Failure — On‑Site Return Within 60 Minutes: benefit, low. If the remote operation system cannot safely operate the bridge, if visibility is degraded (all eight camera views required), or if communications become inoperative, qualified personnel will return and operate the bridge locally within 60 minutes.
- Coast Guard: No Significant Small Entity Impact: benefit, low. Under the Regulatory Flexibility Act (5 U.S.C. 605(b)), the Coast Guard certifies that this proposed rule would not have a significant economic impact on a substantial number of small entities. They list reasons including immediate openings on signal, equal or greater remote capabilities, and the a…

## Related documents

- [2026-20087](https://policyrisk.com/federal-register/2026-20087): Clarification of Certain Mariner Training Requirements, 2026-10-01
- [2026-13137](https://policyrisk.com/federal-register/2026-13137): Marine Casualty Reporting on the Outer Continental Shelf, 2026-06-30
- [2026-08699](https://policyrisk.com/federal-register/2026-08699): Shipping Safety Fairways Along the Atlantic Coast, 2026-05-05
- [2026-22733](https://policyrisk.com/federal-register/2026-22733): Collection of Information Under Review by Office of Management and Budget; OMB Control Number: 1625-0100, 2026-11-09
- [2026-22734](https://policyrisk.com/federal-register/2026-22734): Drawbridge Operation Regulation; Harlem River, Between the Boroughs of Manhattan and the Bronx, New York City, New York, 2026-11-06
- [2026-22677](https://policyrisk.com/federal-register/2026-22677): Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA, 2026-11-06

## Sources
- [2025-21670 on federalregister.gov](https://www.federalregister.gov/documents/2025/12/01/2025-21670/drawbridge-operation-regulation-passaic-river-between-the-city-of-newark-and-town-of-kearny-nj)
- [2025-21670 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2025-12-01/pdf/2025-21670.pdf)

## Related
- [Previous: 2025-21625, Regulatory Capital Rule: Revisions to the Community Bank Leverage Ratio Framewo…](https://policyrisk.com/federal-register/2025-21625)
- [Next: 2025-21679, Receipt of Pesticide Petitions Filed for Residues of Pesticide Chemicals in or…](https://policyrisk.com/federal-register/2025-21679)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2025-21670 (as of 2026-06-11).
