# 2026-00984: River Reroute: FERC Seeks Input on Tule Hydro Tweaks

2026-00984, Southern California Edison Company; Lower Tule Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2026-01-20, effective 2026-02-13 (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2026-00984
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-00984
- Title: Southern California Edison Company; Lower Tule Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 91 FR 2351
- Published: 2026-01-20
- Effective: 2026-02-13
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

River Reroute: FERC Seeks Input on Tule Hydro Tweaks

## Summary

Southern California Edison and Lower Tule Hydro want to change how water flows in their hydroelectric project on the Tule River in California. The government is asking the public and agencies to share their thoughts or objections by February 13, 2026. This could affect local water use and energy production, so it’s important for anyone nearby or interested to speak up soon!

## Effects PRIA read

- Major Flowline Replacement Near Tule River: mixed, medium. If you live near the Middle Fork of the Tule River in Tulare County, California, the licensee proposes to abandon a 13,566-foot section of the existing flowline and replace it with a 4-foot-diameter, 8,575-foot steel pipe. Construction would last about 6 months, require a 30-foot-wide construction…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2026-00984 on federalregister.gov](https://www.federalregister.gov/documents/2026/01/20/2026-00984/southern-california-edison-company-lower-tule-hydro-llc-notice-of-application-accepted-for-filing)
- [2026-00984 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-01-20/pdf/2026-00984.pdf)

## Related
- [Previous: 2026-00983, Idaho Power Company; Notice of Availability of the Draft Supplemental Environme…](https://policyrisk.com/federal-register/2026-00983)
- [Next: 2026-00985, Columbia Gulf Transmission, LLC; Notice of Schedule for the Preparation of an E…](https://policyrisk.com/federal-register/2026-00985)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-00984 (as of 2026-06-08).
