# 2026-01439: Texas Pipeline Push: 2.6 Miles to Fuel Local Factory

2026-01439, Sabine Pipe Line, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2026-01-26 (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2026-01439
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-01439
- Title: Sabine Pipe Line, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 91 FR 3171
- Published: 2026-01-26
- Effective: unknown
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

Texas Pipeline Push: 2.6 Miles to Fuel Local Factory

## Summary

Sabine Pipe Line, LLC wants to build a new 2.6-mile gas pipeline in Orange County, Texas, to deliver up to 80,000 Dth/day of natural gas to a local manufacturing site. The project will cost about $16.3 million and aims to boost energy delivery without delay. If you’re interested, you have until a set deadline to speak up or protest before the plan moves forward.

## Effects PRIA read

- New 2.6‑Mile Gas Pipeline Built: benefit, high. Sabine Pipe Line, LLC filed to build about 2.6 miles of new 12‑inch gas pipeline in Orange County, Texas, connecting to its existing 18‑inch Line TXL0928 and terminating at a manufacturing facility site. The project is sized to provide up to 80,000 Dth/day of firm transportation service and has an…
- Free Public Protest and Intervention: benefit, low. Any person may file a protest, motion to intervene, or comment on this docket for no fee by 5:00 p.m. Eastern Time on March 23, 2026. If no protest is filed within that time (or if a protest is filed and then withdrawn within 30 days after the time allowed for filing a protest), the proposed activi…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2026-01439 on federalregister.gov](https://www.federalregister.gov/documents/2026/01/26/2026-01439/sabine-pipe-line-llc-notice-of-request-under-blanket-authorization-and-establishing-intervention-and)
- [2026-01439 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-01-26/pdf/2026-01439.pdf)

## Related
- [Previous: 2026-01438, Notice of Filing; Wise, James A.](https://policyrisk.com/federal-register/2026-01438)
- [Next: 2026-01440, Combined Notice of Filings](https://policyrisk.com/federal-register/2026-01440)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-01439 (as of 2026-06-08).
