# 2026-03626: Constellation Seeks Smooth Nuclear License Amendments

2026-03626, Constellation Energy Generation, LLC; Christopher M. Crane Clean Energy Center; Applications for Amendments to Renewed Facility License Involving Proposed No Significant Hazards Consideration Determination and Containing Safeguards Information and Order Imposing Procedures for Access to Safeguards Information, is a Federal Register notice from Nuclear Regulatory Commission published 2026-02-24, effective Comments must be filed by March 26, 2026. A request for a hearing or petitions for leave to intervene must be filed by April 27, 2026. Any potential party as defined in section 2.4 of title 10 of the Code of Federal Regulations (10 CFR) who believes access to SGI is necessary to respond to this notice must request document access by March 6, 2026. (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2026-03626
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-03626
- Title: Constellation Energy Generation, LLC; Christopher M. Crane Clean Energy Center; Applications for Amendments to Renewed Facility License Involving Proposed No Significant Hazards Consideration Determination and Containing Safeguards Information and Order Imposing Procedures for Access to Safeguards Information
- Type: Notice
- Agencies: Nuclear Regulatory Commission
- Citation: 91 FR 8910
- Published: 2026-02-24
- Effective: Comments must be filed by March 26, 2026. A request for a hearing or petitions for leave to intervene must be filed by April 27, 2026. Any potential party as defined in section 2.4 of title 10 of the Code of Federal Regulations (10 CFR) who believes access to SGI is necessary to respond to this notice must request document access by March 6, 2026.
- Comments close: 2026-03-26
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

Constellation Seeks Smooth Nuclear License Amendments

## Summary

Constellation Energy wants to update the license for the Christopher M. Crane Clean Energy Center so it can keep running smoothly and safely. The Nuclear Regulatory Commission is reviewing these changes and says they don’t pose big safety risks. If you want to comment or get involved, you’ve got until late March or April 2026, and special rules apply if you need access to sensitive info.

## Abstract

The U.S. Nuclear Regulatory Commission (NRC, the Commission) received and is considering issuance of three amendments to Renewed Facility License (RFL) No. DPR-50 for the Christopher M. Crane Clean Energy Center (CCEC), which were requested by Constellation Energy Generation, LLC (CEG) to support the potential reauthorization of power operations at the CCEC. For each amendment request, the NRC proposes to determine that they involve no significant hazards consideration (NSHC). Because potential parties may deem it necessary to obtain access to safeguards information (SGI) to meet Commission requirements for intervention, the NRC is issuing an order imposing procedures to obtain access to SGI for contention preparation by persons who file a hearing request or petition for leave to intervene.

## Effects PRIA read

- Public comment and hearing deadlines: benefit, low. You can send the NRC comments about the proposed license changes for the Christopher M. Crane Clean Energy Center by March 26, 2026. If you want to ask for a hearing or to intervene, you must file that request or petition by April 27, 2026.
- Safeguards Information access: paperwork and fee: cost, medium. If you need access to sensitive NRC safeguards information (SGI) to prepare a contention, you must request access by March 6, 2026 and submit forms SF-85 and FD-258 (fingerprint card). You must also pay $403.00 per individual for the required background/fingerprint processing and may need to sign a…
- Deadlines to file SGI-based contentions: cost, low. If you receive SGI for preparing a contention, you must file any contentions based on that SGI no later than 25 days after you get the information (unless a later common deadline applies). The NRC's order also sets a target schedule for processing SGI access requests and related filings.

## Related documents

- [2026-19568](https://policyrisk.com/federal-register/2026-19568): Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight, 2026-09-24
- [2026-14341](https://policyrisk.com/federal-register/2026-14341): Modernizing Reactor Licensing, Safety Oversight, and Siting Practices, 2026-07-16
- [2026-13687](https://policyrisk.com/federal-register/2026-13687): Implementation of the National Environmental Policy Act, 2026-07-07
- [2026-12067](https://policyrisk.com/federal-register/2026-12067): Fee Schedules; Fee Recovery for Fiscal Year 2026, 2026-06-16
- [2026-08550](https://policyrisk.com/federal-register/2026-08550): Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles, 2026-05-01
- [2026-08015](https://policyrisk.com/federal-register/2026-08015): Generic Environmental Impact Statement for Licensing of New Nuclear Reactors, 2026-04-24

## Sources
- [2026-03626 on federalregister.gov](https://www.federalregister.gov/documents/2026/02/24/2026-03626/constellation-energy-generation-llc-christopher-m-crane-clean-energy-center-applications-for)
- [2026-03626 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-02-24/pdf/2026-03626.pdf)

## Related
- [Previous: 2026-03625, Applications for Amendments to Facility Operating Licenses Involving Proposed N…](https://policyrisk.com/federal-register/2026-03625)
- [Next: 2026-03627, National Center for Health Statistics, Meeting of the ICD-10 Coordination and M…](https://policyrisk.com/federal-register/2026-03627)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-03626 (as of 2026-06-08).
