2026-03786, Pacific Gas & Electric Company; Notice Of Application For Temporary Flow Modification Accepted For Filing, Soliciting Comments, Motions To Intervene, And Protests, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2026-02-25 (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2026-03786
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-03786
- Title: Pacific Gas & Electric Company; Notice Of Application For Temporary Flow Modification Accepted For Filing, Soliciting Comments, Motions To Intervene, And Protests
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 91 FR 9244
- Published: 2026-02-25
- Effective: unknown
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

PG&E Wants to Tweak River Flows: California Public, Speak Up!

## Summary

Pacific Gas & Electric wants to temporarily change how much water flows through their Potter Valley Hydroelectric Project in California. This affects local rivers and communities, and the public has until March 23, 2026, to share their thoughts or get involved. No big money changes are mentioned, but the decision could impact the environment and water use for a short time.

## Effects PRIA read

- Lower Eel River Minimum Flows Proposed: cost, medium. The licensee asks to reclassify gage E-2 as a critical water year so the minimum flow released into the Eel River below Scott Dam would follow the critical-water-year minimum of 20 cubic feet per second (cfs). The filing also says releases from Scott Dam’s low-level outlet cannot be less than 35 cf…
- East Branch Russian River Flow Schedule: cost, medium. The licensee proposes specific temporary release rates to the East Branch Russian River (gage E-16): April 15–May 14: 35 cfs (normal), 25 cfs (dry), 5 cfs (critical); May 15–June 30: 75 cfs (normal), 25 cfs (dry), 5 cfs (critical). If Lake Pillsbury is not spilling April 15–June 30, releases would…
- Lake Pillsbury Storage Reduced and Targeted: cost, high. PG&E reports leaving Scott Dam spillway gates open indefinitely will reduce Lake Pillsbury’s storage capacity to about 52,600 acre-feet (a reduction of about 18,200 acre-feet). The licensee will maintain a minimum pool of 12,000 acre-feet to avoid bank sloughing and sets a storage target of 25,000…
- Compliance, Block Water, and Reporting Changes: mixed, low. Under the proposed variance, compliance for minimum flows at gage E-11 would be calculated as a 24-hour average instead of instantaneous measurement. The 2,500 acre-feet Block Water allocation would be extended over the 2026 calendar year (January 1 through December 31, 2026) rather than the 2026 w…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2026-03786 on federalregister.gov](https://www.federalregister.gov/documents/2026/02/25/2026-03786/pacific-gas-and-electric-company-notice-of-application-for-temporary-flow-modification-accepted-for)
- [2026-03786 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-02-25/pdf/2026-03786.pdf)

## Related
- [Previous: 2026-03785, Thermoformed Molded Fiber Products From China and Vietnam; Determinations; Corr…](https://policyrisk.com/federal-register/2026-03785)
- [Next: 2026-03787, Columbia Gas Transmission, LLC; Notice of Schedule for the Preparation of an En…](https://policyrisk.com/federal-register/2026-03787)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-03786 (as of 2026-06-08).