2026-04190, Commission Information Collection Activities (FERC-725T, 725Z, 725L, 725G, 725A and 725X); Comment Request; Revision, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2026-03-03, effective Comments on the collection of information are due April 2, 2026.; PRIA reads it as touching household money (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2026-04190
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-04190
- Title: Commission Information Collection Activities (FERC-725T, 725Z, 725L, 725G, 725A and 725X); Comment Request; Revision
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 91 FR 10388
- Published: 2026-03-03
- Effective: Comments on the collection of information are due April 2, 2026.
- Comments close: 2026-04-02
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

FERC Tweaks Power Reports: Grid Safety Gets a Facelift

## Summary

FERC is updating how certain power companies report important data to keep the electric grid safe and reliable. These changes affect generator owners, operators, and transmission folks, with new reporting rules rolling out soon. You’ve got until April 2, 2026, to share your thoughts, and these updates aim to keep things smooth without extra costs.

## Abstract

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725T_BAL-001-TRE (Primary Frequency Response in the ERCOT Region), FERC-725Z_IRO-010-5 (Reliability Coordinator Data and information Specification and Collection), FERC- 725L_MOD-032-1 (Data for Power System Modeling and Analysis), FERC- 725G_PRC-012-2 (Remedial Action Schemes), FERC-725G_PRC-017-1 (Remedial Action Scheme Maintenance and Testing), FERC-725A_TOP-003-6.1 (Transmission Operator and Balancing Authority Data and Information Specification and Collection), FERC-725X_VAR-001-5 (Voltage and Reactive Control), FERC-725X_VAR-002-4.1 (Generator Operation for Maintaining Network Voltage Schedules) (Mandatory Reliability Standards for category 2 generator owners and generator operators). There are anticipated changes in the reporting requirements for this information collection for each of the eight standards. This order published for 60-day notice period on December 18, 2025, and received no comments.

## Effects PRIA read

- Category 2 Generators Now Covered: cost, high. If you own or operate non-bulk inverter-based resources that have or contribute to an aggregate nameplate capacity of at least 20 MVA and connect to a common point at voltage ≥60 kV (called "category 2"), you are now included in the NERC definitions for Generator Owner and Generator Operator. That…
- Estimated Annual Reporting Hours and Costs: cost, high. FERC estimates the new reporting and record-retention tasks will take between 4 and 40 hours per listed requirement per year for affected entities, with per-standard per-respondent costs illustrated in the notice (examples: 4 hrs = $254.08; 8 hrs = $508.16; 20 hrs = $1,270.40; 40 hrs = $2,540.80).…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2026-04190 on federalregister.gov](https://www.federalregister.gov/documents/2026/03/03/2026-04190/commission-information-collection-activities-ferc-725t-725z-725l-725g-725a-and-725x-comment-request)
- [2026-04190 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-03-03/pdf/2026-04190.pdf)

## Related
- [Previous: 2026-04189, Foreign-Trade Zone (FTZ) 18, Notification of Proposed Production Activity; Tesl…](https://policyrisk.com/federal-register/2026-04189)
- [Next: 2026-04191, Pacific Gas and Electric Company; Notice of Application for Temporary Variance…](https://policyrisk.com/federal-register/2026-04191)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-04190 (as of 2026-06-08).