# 2026-06197: Dusty 1992 Mining Rule Finally Gets the Axe

2026-06197, Backfilling and Grading, is a Federal Register rule from Interior Department, Surface Mining Reclamation and Enforcement Office published 2026-03-31, effective 2026-03-30; PRIA reads it as touching household money (as of 2026-06-11).

- Canonical: https://policyrisk.com/federal-register/2026-06197
- As of: 2026-06-11
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-06197
- Title: Backfilling and Grading
- Type: Rule
- Agencies: Interior Department; Surface Mining Reclamation and Enforcement Office
- Citation: 91 FR 15884
- Published: 2026-03-31
- Effective: 2026-03-30
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: 1029-AD03
- Last updated: 2026-06-11

## In one line

Dusty 1992 Mining Rule Finally Gets the Axe

## Summary

The Office of Surface Mining is officially removing an old rule about how quickly mining sites must be backfilled and graded, a rule that’s been on the books but never really used since 1992. After checking public feedback, they found no big issues and confirmed the rule change will take effect on March 30, 2026. This update affects mining companies by giving them clearer, simpler guidelines without extra deadlines or costs.

## Abstract

The Office of Surface Mining Reclamation and Enforcement (OSM) is confirming the effective date of the direct final rule entitled, "Backfilling and Grading," which was originally published on November 28, 2025. The direct final rule rescinded a regulation that prescribed time and distance performance standards for the completion of rough backfilling and grading for surface mining operations that were suspended by the Secretary of the Interior in 1992 but never removed from the Code of Federal Regulations. During the comment period, OSM received two comments that required further review and consideration to determine whether the comments warranted a response or the withdrawal or modification of the final rule. After further review and consideration, OSM determined that these comments were not significant adverse comments and is confirming the effective date of this rule.

## Effects PRIA read

- Old Backfilling Deadlines Removed: benefit, low. If you operate a surface mining operation, the Office of Surface Mining removed a suspended rule that set time-and-distance deadlines for completing rough backfilling and grading. The long-suspended provision (suspended in 1992) is being deleted and the change takes effect on March 30, 2026, which…
- No New Backfilling Rules Now: benefit, low. OSM confirms it is not proposing new time-or-distance backfilling regulations at this time and says removing the suspended language will not change current SMCRA requirements or the agency's ability to issue future rules. The agency reached this conclusion after receiving two timely comments and wi…

## Related documents

- [2025-21443](https://policyrisk.com/federal-register/2025-21443): Rescission of Fee Rates, 2025-11-28
- [2026-21726](https://policyrisk.com/federal-register/2026-21726): Agency Information Collection Activities; 30 CFR 822-Special Permanent Program Performance Standards-Operations in Alluvial Valley Floors, 2026-10-26
- [2026-21835](https://policyrisk.com/federal-register/2026-21835): Wyoming Regulatory Program, 2026-10-26
- [2026-21807](https://policyrisk.com/federal-register/2026-21807): Ohio Regulatory Program, 2026-10-26
- [2026-17821](https://policyrisk.com/federal-register/2026-17821): Montana Regulatory Program, 2026-09-01
- [2026-17333](https://policyrisk.com/federal-register/2026-17333): Montana Regulatory Program, 2026-08-25

## Sources
- [2026-06197 on federalregister.gov](https://www.federalregister.gov/documents/2026/03/31/2026-06197/backfilling-and-grading)
- [2026-06197 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-03-31/pdf/2026-06197.pdf)

## Related
- [Previous: 2026-06196, General Reclamation Requirements](https://policyrisk.com/federal-register/2026-06196)
- [Next: 2026-06214, Modification of Class E Airspace; Denver International Airport, Denver, CO](https://policyrisk.com/federal-register/2026-06214)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-06197 (as of 2026-06-11).
