# 2026-06766: Sabine Pass LNG Expansion Draft EIS Open for Comments

2026-06766, Sabine Pass Liquefaction, LLC; Sabine Pass Liquefaction Stage V, LLC; Sabine Crossing Pipeline, LLC; Cheniere Creole Trail Pipeline, L.P.: Notice of Availability of the Draft Environmental Impact Statement for the Proposed Sabine Pass Stage 5 Expansion Project, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2026-04-08, effective 2026-04-08; PRIA reads it as touching household money (as of 2026-06-08).

- Canonical: https://policyrisk.com/federal-register/2026-06766
- As of: 2026-06-08
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-06766
- Title: Sabine Pass Liquefaction, LLC; Sabine Pass Liquefaction Stage V, LLC; Sabine Crossing Pipeline, LLC; Cheniere Creole Trail Pipeline, L.P.: Notice of Availability of the Draft Environmental Impact Statement for the Proposed Sabine Pass Stage 5 Expansion Project
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 91 FR 17803
- Published: 2026-04-08
- Effective: 2026-04-08
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-06-08

## In one line

Sabine Pass LNG Expansion Draft EIS Open for Comments

## Summary

Sabine Pass is planning a big upgrade by adding new gas processing units and building a 56-mile pipeline plus compressor stations in Louisiana and Texas. This project will boost natural gas export capacity and impact local communities and the environment. People have until May 26, 2026, to share their thoughts before final decisions and investments move forward.

## Effects PRIA read

- Construction will cause short-term local impacts: cost, medium. The Project includes a new 55.6-mile, 48-inch natural gas pipeline, compressor stations, and three new liquefaction trains near communities in Liberty, Chambers, and Jefferson Counties, Texas and Cameron and Beauregard Parishes, Louisiana. The draft EIS says most environmental effects would be limi…
- Some long-term environmental changes possible: cost, medium. The draft EIS finds some long-term or permanent effects could occur to wetlands, forested lands, visual resources, and air quality from the Project in the project area. The Commission staff concluded that, with the Applicants' avoidance, minimization, and mitigation measures and recommended conditi…
- Preliminary safeguards reduce hazardous risk: benefit, low. Based on a preliminary engineering and technical review, the draft EIS finds there are acceptable layers of protection or safeguards that would reduce the risk of a potentially hazardous scenario developing into an event that could impact the offsite public. This is a staff finding in the draft EIS…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2026-06766 on federalregister.gov](https://www.federalregister.gov/documents/2026/04/08/2026-06766/sabine-pass-liquefaction-llc-sabine-pass-liquefaction-stage-v-llc-sabine-crossing-pipeline-llc)
- [2026-06766 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-04-08/pdf/2026-06766.pdf)

## Related
- [Previous: 2026-06765, Notice of Appointment of FASAB Chair and Two Members](https://policyrisk.com/federal-register/2026-06765)
- [Next: 2026-06767, Constitution Pipeline Company, LLC; Iroquois Gas Transmission System, L.P.: Not…](https://policyrisk.com/federal-register/2026-06767)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-06766 (as of 2026-06-08).