2026-09524, Begin Actual Construction in the New Source Review (NSR) Preconstruction Permitting Program, is a Federal Register proposed rule from Environmental Protection Agency published 2026-05-13, effective Comments must be received on or before June 29, 2026.; deemed significant under Executive Order 12866; PRIA reads it as touching household money (as of 2026-06-11).

- Canonical: https://policyrisk.com/federal-register/2026-09524
- As of: 2026-06-11
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-09524
- Title: Begin Actual Construction in the New Source Review (NSR) Preconstruction Permitting Program
- Type: Proposed Rule
- Agencies: Environmental Protection Agency
- Citation: 91 FR 26958
- Published: 2026-05-13
- Effective: Comments must be received on or before June 29, 2026.
- Comments close: 2026-06-29
- Significant: yes (FR_METADATA)
- Touches household money: yes
- Regulation identifier numbers: 2060-AW84
- Last updated: 2026-06-11

## In one line

EPA Lets Firms Build Non-Polluting Parts Before Full Air Permit Approval

## Summary

The EPA is updating rules about when companies can start building big projects that might affect air quality. Now, they can begin building parts that don’t release pollution before getting a full air permit, making things clearer and easier. This change mainly affects businesses planning major construction and could speed up projects without extra costs, but comments are due by June 29, 2026.

## Abstract

The U.S. Environmental Protection Agency (EPA) is proposing revisions to the New Source Review (NSR) air permitting regulations. These regulatory revisions would distinguish between construction of a stationary source and construction of non-emitting components or structures, while clarifying and codifying that the latter can occur before an owner or operator obtains an NSR air permit for a new major stationary source or major modification of an existing major stationary source. The revisions will update the definition of "begin actual construction" and add a definition of "pollutant-emitting activities" in the Federal NSR regulations for both Nonattainment New Source Review (NNSR) and Prevention of Significant Deterioration (PSD); revise the definition of "begin construction" and "commence construction" in the Federal minor NSR regulations applicable in Indian country; and address the applicability procedures for "begin actual construction" in the NNSR regulations.

## Effects PRIA read

- Build Non‑Emitting Work Before NSR Permit: benefit, medium. If you are building a major facility that needs an NSR permit, the EPA is proposing you could begin constructing non‑polluting components (for example, utility infrastructure, concrete pads, and some building components) before getting a final NSR permit. The change applies to major stationary sour…
- Tribal NSR Definitions Updated: benefit, low. In areas of Indian country, the EPA proposes revising the Tribal NSR rules at 40 CFR 49.152 to change and align definitions (renaming "begin construction" to "begin actual construction" and revising "commence construction") for minor sources and minor modifications at existing major sources. This a…

## Related documents

- [2026-22082](https://policyrisk.com/federal-register/2026-22082): Additional Reconsideration Standards of Performance for New, Reconstructed, and Modified Sources and Emissions Guidelines for Existing Sour…, 2026-10-29
- [2026-21155](https://policyrisk.com/federal-register/2026-21155): Renewable Fuel Standard (RFS) Program: Reallocation of Additional 2025 Small Refinery Exemptions, 2026-10-16
- [2026-20849](https://policyrisk.com/federal-register/2026-20849): Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes To Reflect Administration Policy, 2026-10-13
- [2026-19071](https://policyrisk.com/federal-register/2026-19071): Partial Repeal of the Carbon Pollution Standards for Fossil Fuel-Fired Electric Generating Units, 2026-09-17
- [2026-19072](https://policyrisk.com/federal-register/2026-19072): Rescission of the Greenhouse Gas Findings for Fossil Fuel-Fired Power Plants and Repeal of Regulations for Power Plant Greenhouse Gas Emiss…, 2026-09-17
- [2026-18317](https://policyrisk.com/federal-register/2026-18317): Updated Definition of “Waters of the United States”, 2026-09-09

## Sources
- [2026-09524 on federalregister.gov](https://www.federalregister.gov/documents/2026/05/13/2026-09524/begin-actual-construction-in-the-new-source-review-nsr-preconstruction-permitting-program)
- [2026-09524 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-05-13/pdf/2026-09524.pdf)

## Related
- [Previous: 2026-09500, Blueberry Promotion, Research, and Information Order; Continuance Referendum](https://policyrisk.com/federal-register/2026-09500)
- [Next: 2026-09574, Airworthiness Directives; Diamond Aircraft Industries Inc. Airplanes](https://policyrisk.com/federal-register/2026-09574)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-09524 (as of 2026-06-11).