# 2026-13461: Maine Dam Seeks New License in Routine Regulatory Filing

2026-13461, Great Lakes Hydro America, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2026-07-02; PRIA reads it as touching household money (as of 2026-07-09).

- Canonical: https://policyrisk.com/federal-register/2026-13461
- As of: 2026-07-09
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-13461
- Title: Great Lakes Hydro America, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 91 FR 40526
- Published: 2026-07-02
- Effective: unknown
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-07-09

## In one line

Maine Dam Seeks New License in Routine Regulatory Filing

## Summary

Great Lakes Hydro America wants a new license to keep running the Penobscot Mills Hydroelectric Project in Maine. The government is now reviewing the application and asking the public and stakeholders to share their thoughts by August 28, 2026. This process could affect local communities, the environment, and how energy is produced in the area, with important decisions coming soon.

## Effects PRIA read

- Minimum river flows and lake levels: benefit, medium. If you live in Maine near the Penobscot Mills Project, GLHA proposes specific water levels and minimum flows: target North Twin impoundment elevations of 490.42 ft NGVD 29 from May 1 through August 21 and 488.42 ft NGVD 29 from August 22 through October 15; a 3,000-cfs minimum flow in the West Bran…
- Seasonal whitewater boating flows: benefit, low. If you boat or recreate on Millinocket Stream in Maine, GLHA proposes seasonal whitewater boating flows of 600 cubic feet per second (600 cfs) in Millinocket Stream.
- Fish passage and American eel measures: benefit, low. GLHA proposes to continue operating the pool-and-weir fish passage at North Twin, provide American eel passage, conduct eel studies, and develop a fishway operations and maintenance plan for the Penobscot Mills Project in Maine.
- Battery storage to enhance reliability: benefit, medium. The Penobscot Mills Project includes two battery energy sites that operate as a single battery energy storage system to enhance system reliability; the total rated capacity of the project is 67.9 megawatts.
- Public posting of lake levels and streamflows: benefit, low. GLHA proposes to post lake level and streamflow information for North Twin and Millinocket Lake Storage on Brookfield Renewable, N.A.'s SafeWaters website so the public can view current conditions.
- Conservation and shoreline buffers maintained: benefit, low. GLHA proposes to maintain a 200-foot conservation buffer and a 100-foot vegetation buffer around the Millinocket Lake Storage, North Twin, Millinocket, and Dolby impoundments and to maintain Umbazooksus Lake as wetland and wildlife habitat.

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2026-13461 on federalregister.gov](https://www.federalregister.gov/documents/2026/07/02/2026-13461/great-lakes-hydro-america-llc-notice-of-application-accepted-for-filing-soliciting-motions-to)
- [2026-13461 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-07-02/pdf/2026-13461.pdf)

## Related
- [Previous: 2026-13460, ANR Pipeline Company; Notice of Scoping Period Requesting Comments on Environme…](https://policyrisk.com/federal-register/2026-13460)
- [Next: 2026-13462, Alabama Power Company; Notice of Application Accepted for Filing and Soliciting…](https://policyrisk.com/federal-register/2026-13462)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-13461 (as of 2026-07-09).
