# 2026-19981: Tiny 8kW Hydropower Sneaks Onto Arizona Irrigation Canal

2026-19981, Breaker Water & Energy Park, LLC; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2026-09-30; PRIA reads it as touching household money (as of 2026-10-07).

- Canonical: https://policyrisk.com/federal-register/2026-19981
- As of: 2026-10-07
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-19981
- Title: Breaker Water & Energy Park, LLC; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 91 FR 61839
- Published: 2026-09-30
- Effective: unknown
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-10-07

## In one line

Tiny 8kW Hydropower Sneaks Onto Arizona Irrigation Canal

## Summary

Breaker Water & Energy Park, LLC wants to build a small 8-kilowatt hydropower project on a canal in Buckeye, Arizona. The project meets all the rules to be a 'qualifying conduit hydropower facility,' meaning it won’t mess with the canal’s main job of delivering water for farming. The Federal Energy Regulatory Commission is asking for public comments and invites people to get involved before making a final decision.

## Effects PRIA read

- 8 kW canal hydropower deemed qualifying: benefit, low. Breaker Water & Energy Park filed to build an 8-kilowatt (kW) hydrokinetic turbine on the Buckeye Main Canal near Buckeye, Maricopa County, Arizona. Commission staff preliminarily determined the project meets the section 30 criteria (uses a conduit operated for agricultural water distribution, uses…
- Public comment and intervention deadline: benefit, low. The Commission is soliciting public comments, comments contesting qualification, and motions to intervene with a filing deadline of October 26, 2026, 5:00 p.m. Eastern Time. Filings must be labeled in all caps as "COMMENTS," "COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY," or…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2026-19981 on federalregister.gov](https://www.federalregister.gov/documents/2026/09/30/2026-19981/breaker-water-and-energy-park-llc-notice-of-preliminary-determination-of-a-qualifying-conduit)
- [2026-19981 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-09-30/pdf/2026-19981.pdf)

## Related
- [Previous: 2026-19980, Notice of Federal Advisory Committee Meeting](https://policyrisk.com/federal-register/2026-19980)
- [Next: 2026-19982, Combined Notice of Filings #1](https://policyrisk.com/federal-register/2026-19982)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-19981 (as of 2026-10-07).
