# 2026-19983: Sabine Pass Gas Empire Expands with New Pipeline EIS Ready

2026-19983, Sabine Pass Liquefaction, LLC, Sabine Pass Liquefaction Stage V, LLC, Sabine Crossing Pipeline, LLC, Cheniere Creole Trail Pipeline, L.P.; Notice of Availability of the Final Environmental Impact Statement for the Proposed Sabine Pass Stage 5 Expansion Project, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2026-09-30; PRIA reads it as touching household money (as of 2026-10-07).

- Canonical: https://policyrisk.com/federal-register/2026-19983
- As of: 2026-10-07
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-19983
- Title: Sabine Pass Liquefaction, LLC, Sabine Pass Liquefaction Stage V, LLC, Sabine Crossing Pipeline, LLC, Cheniere Creole Trail Pipeline, L.P.; Notice of Availability of the Final Environmental Impact Statement for the Proposed Sabine Pass Stage 5 Expansion Project
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 91 FR 61844
- Published: 2026-09-30
- Effective: unknown
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-10-07

## In one line

Sabine Pass Gas Empire Expands with New Pipeline EIS Ready

## Summary

Sabine Pass Liquefaction and partners want to expand their natural gas terminal in Louisiana by adding new equipment and building a big new pipeline through Texas and Louisiana. This project will boost natural gas processing and transport, affecting local communities and the environment. The final environmental report is ready, helping the government decide if the project can move forward soon, with big investments and construction ahead.

## Effects PRIA read

- Large LNG and Pipeline Construction Nearby: cost, medium. The project will add three new liquefaction trains at the Sabine Pass terminal (Trains 7, 8, and 9) and build a new 48-inch-diameter, 55.6-mile pipeline (Sabine Crossing Pipeline) plus aboveground facilities across Liberty, Chambers, and Jefferson Counties, Texas and Cameron and Beauregard Parishes…
- Long-term Environmental Effects Identified: cost, medium. The Final Environmental Impact Statement says most effects would be limited or temporary during construction, but it finds some long-term and permanent effects would occur in wetlands, forested lands, visual resources, and on air quality in the project area.
- FERC Sees Mitigation and Safety Measures: benefit, low. FERC staff conclude that with the Applicants' proposed avoidance, minimization, and mitigation measures plus recommended environmental and engineering conditions, most effects would be less than significant, and there are acceptable layers of protection to reduce the risk of a hazardous scenario af…

## Related documents

- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22877](https://policyrisk.com/federal-register/2026-22877): Combined Notice of Filings, 2026-11-10
- [2026-22803](https://policyrisk.com/federal-register/2026-22803): Northern Illinois Hydropower, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Solic…, 2026-11-09
- [2026-22791](https://policyrisk.com/federal-register/2026-22791): Combined Notice of Filings, 2026-11-09
- [2026-22721](https://policyrisk.com/federal-register/2026-22721): Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Leidy Access Exp…, 2026-11-06

## Sources
- [2026-19983 on federalregister.gov](https://www.federalregister.gov/documents/2026/09/30/2026-19983/sabine-pass-liquefaction-llc-sabine-pass-liquefaction-stage-v-llc-sabine-crossing-pipeline-llc)
- [2026-19983 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-09-30/pdf/2026-19983.pdf)

## Related
- [Previous: 2026-19982, Combined Notice of Filings #1](https://policyrisk.com/federal-register/2026-19982)
- [Next: 2026-19984, Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authoriz…](https://policyrisk.com/federal-register/2026-19984)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-19983 (as of 2026-10-07).
