# 2026-23231: Dry River Means Temporary Flow Cut at New England Dam

2026-23231, Great River Hydro, LLC; Notice of Intent To Prepare an Environmental Assessment, is a Federal Register notice from Energy Department, Federal Energy Regulatory Commission published 2026-11-16 (as of 2026-11-17).

- Canonical: https://policyrisk.com/federal-register/2026-23231
- As of: 2026-11-17
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-23231
- Title: Great River Hydro, LLC; Notice of Intent To Prepare an Environmental Assessment
- Type: Notice
- Agencies: Energy Department; Federal Energy Regulatory Commission
- Citation: 91 FR 73577
- Published: 2026-11-16
- Effective: unknown
- Comments close: not stated
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-11-17

## In one line

Dry River Means Temporary Flow Cut at New England Dam

## Summary

Great River Hydro, LLC wants to temporarily reduce water flow at the Fifteen Mile Falls Hydroelectric Project because of low river levels caused by less rain. This change affects communities near the Connecticut River in New Hampshire and Vermont and will last until the end of 2026. The government is preparing an environmental check and will ask for public feedback before making a final decision.

## Effects PRIA read

- Temporary cut to river minimum flows: mixed, low. You live near the Connecticut River in Grafton County, New Hampshire, or Caledonia County, Vermont, the licensee plans to reduce required minimum flows to 600 cubic feet per second (cfs). The change would lower the seasonal minimums of 818 cfs (June 1–September 30) and 1,145 cfs (October 1–March 31…
- Environmental assessment and public comment window: benefit, low. You can participate in the review: Commission staff plans to prepare an environmental assessment (EA) and issue it by December 30, 2026, and the EA will be issued for a 30-day public comment period. All comments filed on the EA will be reviewed and considered in the Commission's final decision on t…

## Related documents

- [2026-23133](https://policyrisk.com/federal-register/2026-23133): Combined Notice of Filings #2, 2026-11-13
- [2026-23132](https://policyrisk.com/federal-register/2026-23132): Combined Notice of Filings, 2026-11-13
- [2026-22946](https://policyrisk.com/federal-register/2026-22946): International Falls Power Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed International Fall…, 2026-11-12
- [2026-22949](https://policyrisk.com/federal-register/2026-22949): GB Energy Park, LLC; Notice of Request for Extension of Time To Commence and Complete Construction Accepted for Filing, Soliciting Comments…, 2026-11-12
- [2026-22878](https://policyrisk.com/federal-register/2026-22878): ConocoPhillips Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 2026-11-10
- [2026-22879](https://policyrisk.com/federal-register/2026-22879): Combined Notice of Filings #1, 2026-11-10

## Sources
- [2026-23231 on federalregister.gov](https://www.federalregister.gov/documents/2026/11/16/2026-23231/great-river-hydro-llc-notice-of-intent-to-prepare-an-environmental-assessment)
- [2026-23231 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-11-16/pdf/2026-23231.pdf)

## Related
- [Previous: 2026-23227, Notice on Outer Continental Shelf Oil and Gas Lease Sales](https://policyrisk.com/federal-register/2026-23227)
- [Next: 2026-23232, Delfin LNG LLC; Notice of Request for Extension of Time](https://policyrisk.com/federal-register/2026-23232)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-23231 (as of 2026-11-17).
