## Facts
- Document number: 2026-23395
- Title: In the Matter of TRISO-X, LLC; Confirmatory Order Modifying License
- Type: Notice
- Agencies: Nuclear Regulatory Commission
- Citation: 91 FR 73818
- Published: 2026-11-17
- Effective: 2026-10-21
- Comments close: not stated
- Significant: no
- Touches household money: yes
- Regulation identifier numbers: none
- Last updated: 2026-11-17

## In one line

Nuclear Regulator Turns Construction Safety Talks Into Binding Order

## Summary

The Nuclear Regulatory Commission (NRC) worked with TRISO-X, LLC to fix a safety issue with their TX-1 building’s structure during construction. After some talks and mediation, TRISO-X agreed to make important changes to keep things safe, and the NRC made these promises official with a Confirmatory Order on October 21, 2026. This means TRISO-X must follow the new rules right away, avoiding any fines or penalties.

## Abstract

The U.S. Nuclear Regulatory Commission (NRC) is issuing a Confirmatory Order to TRISO-X, LLC (the licensee), as a result of a successful Alternative Dispute Resolution (ADR) mediation. On June 9, 2026, the NRC notified the licensee of an apparent violation being considered for escalated enforcement. The apparent violation involved the implementation of management measures to ensure the design basis supporting the structural stability function of the TX-1 process building's main force resisting system (MFRS) was maintained during construction. The NRC provided the licensee with the opportunity to respond through a written response, a Pre-decisional Enforcement Conference (PEC), or ADR. The licensee elected to participate in ADR, and mediation sessions were held on July 29 and August 20, 2026, during which the parties reached an Agreement in Principle. As part of the agreement, the licensee committed to taking certain corrective actions and consented to the issuance of a Confirmatory Order to make those commitments legally binding and resolve the apparent violation without further enforcement action by the NRC. The Confirmatory Order is effective upon issuance.

## Effects PRIA read

- NRC Waives Violation Notice and Penalty: benefit, medium. The NRC agreed not to issue a notice of violation and not to impose a civil penalty for the matters described in its June 9, 2026 letter. This agreement is part of a Confirmatory Order effective October 21, 2026 and applies to TRISO-X License SNM-7007 for the issues raised in NRC Inspection Report…
- Must Demonstrate Welds Meet 7/16-Inch Standard: cost, high. TRISO-X must show within 30 days of October 21, 2026 that the existing braced-frame intersection welds meet design and code requirements using a revised 7/16-inch effective throat. If NRC finds the demonstration insufficient, TRISO-X must repair, replace, or redesign all braced-frame intersection w…
- Inspections and Fixes for Fillet Welds Required: cost, medium. Within 6 months of October 21, 2026, TRISO-X must perform additional inspections (visual, non-destructive testing, or other methods) of completed SCBF fillet welds that were not inspected as required, demonstrate those inspections ensure code conformance to IBC-2018 and related standards, and corre…
- New Training and Safety Culture Requirements: benefit, low. TRISO-X must provide Nuclear Safety Culture training to construction oversight, engineering, regulatory, and quality teams and contractor management within 6 months of October 21, 2026. TRISO-X must also provide training for laborers and craft workers within 6 months to reinforce build-to-print wor…
- Stronger Contractor Oversight and Quality Controls: mixed, medium. TRISO-X must revise its Contractor Management procedure within 3 months of October 21, 2026 to implement a sitewide construction surveillance plan, fix role/responsibility issues, and set monitoring metrics. TRISO-X also revised contractor quality plans, replaced a QC subcontractor (letter dated Ju…

## Related documents

- [2026-19568](https://policyrisk.com/federal-register/2026-19568): Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight, 2026-09-24
- [2026-14341](https://policyrisk.com/federal-register/2026-14341): Modernizing Reactor Licensing, Safety Oversight, and Siting Practices, 2026-07-16
- [2026-13687](https://policyrisk.com/federal-register/2026-13687): Implementation of the National Environmental Policy Act, 2026-07-07
- [2026-12067](https://policyrisk.com/federal-register/2026-12067): Fee Schedules; Fee Recovery for Fiscal Year 2026, 2026-06-16
- [2026-08550](https://policyrisk.com/federal-register/2026-08550): Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles, 2026-05-01
- [2026-08015](https://policyrisk.com/federal-register/2026-08015): Generic Environmental Impact Statement for Licensing of New Nuclear Reactors, 2026-04-24

## Sources
- [2026-23395 on federalregister.gov](https://www.federalregister.gov/documents/2026/11/17/2026-23395/in-the-matter-of-triso-x-llc-confirmatory-order-modifying-license)
- [2026-23395 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-11-17/pdf/2026-23395.pdf)

## Related
- [Previous: 2026-23394, Statement of Organization, Functions, and Delegations of Authority](https://policyrisk.com/federal-register/2026-23394)
- [Next: 2026-23396, Agency Information Collection Activities; Comment Request; Federal Direct Loan…](https://policyrisk.com/federal-register/2026-23396)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-23395 (as of 2026-11-17).