# 2026-23998: Bikes Get the Go-Ahead on Kennesaw Mountain Battlefield Trails

2026-23998, Written Determination: Bicycle Use at Kennesaw Mountain National Battlefield Park, is a Federal Register notice from Interior Department, National Park Service published 2026-11-25, effective Comments on this written determination must be received by 11:59 EDT on December 28, 2026. (as of 2026-11-25).

- Canonical: https://policyrisk.com/federal-register/2026-23998
- As of: 2026-11-25
- Plain-text twin of the page above; the HTML and this file carry the same facts.

## Facts
- Document number: 2026-23998
- Title: Written Determination: Bicycle Use at Kennesaw Mountain National Battlefield Park
- Type: Notice
- Agencies: Interior Department; National Park Service
- Citation: 91 FR 76261
- Published: 2026-11-25
- Effective: Comments on this written determination must be received by 11:59 EDT on December 28, 2026.
- Comments close: 2026-12-28
- Significant: no
- Touches household money: no
- Regulation identifier numbers: none
- Last updated: 2026-11-25

## In one line

Bikes Get the Go-Ahead on Kennesaw Mountain Battlefield Trails

## Summary

The National Park Service is opening about 0.85 miles of new and existing trails at Kennesaw Mountain National Battlefield Park for bike riding. This change keeps the park safe and beautiful without disturbing wildlife. If you want to share your thoughts, make sure to comment by December 28, 2026!

## Abstract

The National Park Service determines that allowing bicycles on approximately 0.85 miles of new and existing multi-use trails within Kennesaw Mountain National Battlefield Park is consistent with the protection of the park's natural, scenic, and aesthetic values; safety considerations; and management objectives; and will not disturb wildlife or park resources.

## Effects PRIA read

- 0.85 Miles of Trails Opened to Bicycles: benefit, low. The National Park Service is allowing bicycles on about 0.85 miles of trails at Kennesaw Mountain National Battlefield Park, specifically the Noonday Creek Trail, the Mountain to River Trail, the new tunnel, and connecting trail segments. The agency determined this bicycle use is consistent with pr…
- Tunnel Built to Improve Safety at Highway Crossing: benefit, low. The Selected Alternative includes construction of a tunnel beneath the south leg of the Old 41 Highway/Stilesboro Road intersection so visitors can access park amenities from the overflow lot without crossing Stilesboro Road at grade. The tunnel and connected trails are intended to reduce vehicle–b…
- Cobb County Responsible for Trail Maintenance: cost, low. Future maintenance and rehabilitation of the Noonday Trail, Mountain to River Trail, the tunnel, and connecting trail segments will be the responsibility of Cobb County under a future maintenance agreement and cooperative management agreement with the National Park Service. Cobb County will outline…
- Electric Bicycles May Be Allowed in Designated Areas: benefit, low. The notice states that electric bicycles (as defined at 36 CFR 1.4) may be allowed on park roads, parking areas, administrative roads, and trails that are otherwise open to bicycles. The Superintendent will designate which areas or classes of electric bicycles are allowed and will notify the public…

## Related documents

- [2026-04606](https://policyrisk.com/federal-register/2026-04606): Alaska; Hunting and Trapping in National Preserves, 2026-03-10
- [2026-23563](https://policyrisk.com/federal-register/2026-23563): Mammoth Cave National Park; Bicycling and Horses, 2026-11-19
- [2026-23299](https://policyrisk.com/federal-register/2026-23299): Record of Decision; Temporary Closure of East Potomac Park South of Buckeye Drive, 2026-11-16
- [2026-22736](https://policyrisk.com/federal-register/2026-22736): Agency Information Collection Activities; National Park Service Concessioner Services Customer Satisfaction Survey, 2026-11-09
- [2026-22670](https://policyrisk.com/federal-register/2026-22670): National Register of Historic Places; Notification of Pending Nominations and Related Actions, 2026-11-06
- [2026-22422](https://policyrisk.com/federal-register/2026-22422): National Register of Historic Places; Notification of Pending Nominations and Related Actions, 2026-11-03

## Sources
- [2026-23998 on federalregister.gov](https://www.federalregister.gov/documents/2026/11/25/2026-23998/written-determination-bicycle-use-at-kennesaw-mountain-national-battlefield-park)
- [2026-23998 as published (PDF)](https://www.govinfo.gov/content/pkg/FR-2026-11-25/pdf/2026-23998.pdf)

## Related
- [Previous: 2026-23995, Compounding Animal Drugs From Bulk Drug Substances: Compounding Under CGMP in F…](https://policyrisk.com/federal-register/2026-23995)
- [Next: 2026-24000, Medicare, Medicaid, and Children's Health Insurance Programs; Provider Enrollme…](https://policyrisk.com/federal-register/2026-24000)
- [All Federal Register documents](https://policyrisk.com/federal-register)

Source: PRIA, https://policyrisk.com/federal-register/2026-23998 (as of 2026-11-25).
