## Facts
- Bill: 119-hr-603
- Congress: 119
- Title: Reinforcing the Grid Against Extreme Weather Act of 2025
- Status: introduced
- Introduced: 2025-01-22
- Sponsor: Rep. Casten, Sean [D-IL-6] (D-IL)
- Cosponsors: 0
- Policy area: Energy
- Touches household money: yes
- Last recorded action: 2025-12-21

## Summary

**Expand and coordinate interregional transmission capacity** to make the grid more reliable against extreme weather, physical attacks, and cyber threats. The bill would require the Federal Energy Regulatory Commission to set uniform measurement rules, a minimum transferable capability between adjacent planning regions, and a process for selecting and paying for interregional projects. - Families and households would see stronger electric reliability and better access to lower-cost generation when regions share capacity, which can reduce outages and congestion risks. - Regional transmission planners and grid operators would have to file coordinated plans every 3 years, use uniform methods to measure transfer capability, and meet a minimum transferable capacity to address resilience. - Utilities and developers would face a new project selection and cost-allocation regime that identifies interregional transmission projects and assigns costs based on quantified transmission benefits.

## Provisions PRIA read

- New rules to move power between regions: benefit, high. If enacted, the Federal Energy Regulatory Commission (FERC) would issue rules within 24 months. The rules would require one shared method to measure how much power can flow between neighboring regions. They would set a minimum transfer level to keep the grid reliable during extreme weather, physica…
- Regular regional grid plans and oversight: benefit, high. Adjacent regional planners would file an interregional plan with FERC within 3 years of enactment. They would update plans at least every 5 years. Plans must meet the minimum transfer levels and select projects based on defined transmission benefits. FERC would approve or deny plans using those fac…
- Public reports and clear planning definitions: benefit, medium. FERC would publish a report in the Federal Register within 48 months after issuing the rules. It would publish a new report every year after. Reports would show progress toward meeting minimum transfer levels and selecting projects. The bill would also add definitions, effective on enactment. It de…

## Related bills

- 119-hr-7977: Energy Bills Relief Act
- 119-hr-7973: Momnibus Act
- 119-hr-3971: Domestic Workers Bill of Rights Act
- 119-hr-2725: Affordable Housing Credit Improvement Act of 2025
- 119-hr-7853: PrEP Access and Coverage Act of 2026
- 119-hres-1058: Recognizing that it is the duty of the Federal Government to develop and implement a Transgender Bill of Rights to protect and codify the rights of transgender…

## Sources
- [119-hr-603 on Congress.gov](https://www.congress.gov/bill/119th-congress/house-bill/603)

## Related
- [119-hr-7977: Energy Bills Relief Act](https://policyrisk.com/legislation/119-hr-7977)
- [119-hr-7973: Momnibus Act](https://policyrisk.com/legislation/119-hr-7973)
- [119-hr-3971: Domestic Workers Bill of Rights Act](https://policyrisk.com/legislation/119-hr-3971)
- [119-hr-2725: Affordable Housing Credit Improvement Act of 2025](https://policyrisk.com/legislation/119-hr-2725)
- [119-hr-7853: PrEP Access and Coverage Act of 2026](https://policyrisk.com/legislation/119-hr-7853)
- [119-hres-1058: Recognizing that it is the duty of the Federal Government to develop and implem…](https://policyrisk.com/legislation/119-hres-1058)
- [All bills in Congress](https://policyrisk.com/legislation)

Source: PRIA, https://policyrisk.com/legislation/119-hr-603 (as of 2025-12-21).