§833 Completion and maintenance of project; generation of electricity

Title 16 › Chapter CHAPTER 12C— - FORT PECK PROJECT › § 833

Last updated Apr 6, 2026|Official source

Summary

Finish and operate the Fort Peck dam and its power plant to improve Missouri River navigation. The project is run under the Secretary of the Army and the Chief of Engineers, but the Bureau of Reclamation controls sending and sale of the power under section 833a(a); the Army must supply and maintain equipment the Bureau says is needed to produce power as fast as markets are found, and any power not needed for the dam or navigation must go to the Bureau to handle under this chapter.

Full Legal Text

Title 16, §833

Conservation — Source: USLM XML via OLRC

For the purpose of improving navigation on the Missouri River, and for other purposes incidental thereto, the dam and appurtenant works now under construction at Fort Peck, Montana, and a suitable power plant for the production of hydroelectric power (which dam, power plant, and appurtenant works are hereinafter called Fort Peck project), shall be completed, maintained, and operated under the direction of the Secretary of the Army and the supervision of the Chief of Engineers, subject to the provisions of this chapter relating to the powers and duties of the Bureau of Reclamation (hereinafter called the Bureau), as provided for in section 833a(a) of this title, respecting the transmission and sale of electric energy generated at said project. The Secretary of the Army shall provide, construct, operate, maintain, and improve at Fort Peck project such machinery, equipment, and facilities for the generation of electric energy as the Bureau may deem necessary to develop such electric energy as rapidly as markets may be found therefor. The electric energy thus generated and not required for the operation of the dam at such project and the navigation facilities employed in connection therewith shall be delivered to the Bureau for disposition as provided in this chapter.

Legislative History

Notes & Related Subsidiaries

Statutory Notes and Related Subsidiaries

Change of Name

Department of War designated Department of the Army and title of Secretary of War changed to Secretary of the Army by section 205(a) of act
July 26, 1947, ch. 343, title II, 61 Stat. 501. section 205(a) of act
July 26, 1947, was repealed by section 53 of act Aug. 10, 1956, ch. 1041, 70A Stat. 641. section 1 of act Aug. 10, 1956, enacted “Title 10, Armed Forces” which in sections 3010 to 3013 continued military Department of the Army under administrative supervision of Secretary of the Army.

Transfer of Functions

Power marketing functions of Bureau of Reclamation, including

Construction

, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by section 7152(a)(1)(E), (3) of Title 42, The Public Health and Welfare, and are to be exercised by Secretary through a separate Administration within Department of Energy.

Executive Documents

Transfer of Functions

For

Transfer of Functions

of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§ 1, 2, eff. May 24, 1950, 15 F.R. 3174, 64 Stat. 1262, set out in the Appendix to Title 5, Government Organization and Employees.