Title 43 › Chapter CHAPTER 32A— - COLORADO RIVER BASIN SALINITY CONTROL › Subchapter SUBCHAPTER II— - MEASURES UPSTREAM FROM IMPERIAL DAM › § 1596
Starting January 1, 1975, and every two years after, the Secretary must send the same report to the President, Congress, and the Advisory Council created in section 1594(a). The report must describe last fiscal year’s work on the Colorado River salinity control program: investigations, planning, and construction done; how well salinity control units are working; what work is needed next, with special focus on the next five years; and any problems slowing progress. The report may be included in the Secretary’s biennial Colorado River Basin water-quality report required under sections 620n, 615ww, and 616e.
Full Legal Text
Public Lands — Source: USLM XML via OLRC
Legislative History
Reference
Citation
43 U.S.C. § 1596
Title 43 — Public Lands
Last Updated
Apr 6, 2026
Release point: 119-73