Title 43Public LandsRelease 119-73

§1764 General requirements

Title 43 › Chapter CHAPTER 35— - FEDERAL LAND POLICY AND MANAGEMENT › Subchapter SUBCHAPTER V— - RIGHTS-OF-WAY › § 1764

Last updated Apr 6, 2026|Official source

Summary

The Secretary must draw clear, precise limits for each right to use public land. The area can only cover land needed for the project, for operating or keeping it safe, and it must avoid unnecessary harm to the environment. The Secretary can allow temporary use of nearby land for building, access, repairs, or ending the project. Rights are for a reasonable time based on cost, how long the facility will last, and any public purpose. The papers must say if the right can be renewed and on what terms. The Secretary will make and follow rules about size, length, surveys, location, construction, upkeep, transfer, and ending the right. For new projects that may significantly affect the environment, the applicant must submit a construction, operation, and land-repair plan that follows the Secretary’s rules, including the rules under section 1765. Removing minerals or plants is allowed only with proper permission or for emergency repairs under section 1761(c). Holders must pay the Secretary the fair market value up front. The Secretary can require yearly or multi-year payments. If the annual fee is more than $100, a private person may choose yearly or multi-year payments. The Secretary may waive rent if the holder gives a right to the United States as part of a cost-share deal. The Secretary may also require the applicant to pay the government’s reasonable processing and inspection costs unless a cost-share program applies. Some rights may be given at reduced or no rent to governments, certain nonprofits, or holders providing public benefit, but those reduced deals cannot be transferred without approval. Money collected goes into a special Treasury account. Electric or telephone lines eligible under the Rural Electrification Act of 1936 may be rent-free, though processing costs can still be charged. The Secretary will set rules on liability and how holders must protect the United States from claims, and any no-fault liability must include a maximum amount. The Secretary may require a bond or other security. A right is only given if the applicant has the technical and financial ability to carry out the project.

Full Legal Text

Title 43, §1764

Public Lands — Source: USLM XML via OLRC

(a)The Secretary concerned shall specify the boundaries of each right-of-way as precisely as is practical. Each right-of-way shall be limited to the ground which the Secretary concerned determines (1) will be occupied by facilities which constitute the project for which the right-of-way is granted, issued, or renewed, (2) to be necessary for the operation or maintenance of the project, (3) to be necessary to protect the public safety, and (4) will do no unnecessary damage to the environment. The Secretary concerned may authorize the temporary use of such additional lands as he determines to be reasonably necessary for the construction, operation, maintenance, or termination of the project or a portion thereof, or for access thereto.
(b)Each right-of-way or permit granted, issued, or renewed pursuant to this section shall be limited to a reasonable term in light of all circumstances concerning the project. In determining the duration of a right-of-way the Secretary concerned shall, among other things, take into consideration the cost of the facility, its useful life, and any public purpose it serves. The right-of-way shall specify whether it is or is not renewable and the terms and conditions applicable to the renewal.
(c)Rights-of-way shall be granted, issued, or renewed pursuant to this subchapter under such regulations or stipulations, consistent with the provisions of this subchapter or any other applicable law, and shall also be subject to such terms and conditions as the Secretary concerned may prescribe regarding extent, duration, survey, location, construction, maintenance, transfer or assignment, and termination.
(d)The Secretary concerned prior to granting or issuing a right-of-way pursuant to this subchapter for a new project which may have a significant impact on the environment, shall require the applicant to submit a plan of construction, operation, and rehabilitation for such right-of-way which shall comply with stipulations or with regulations issued by that Secretary, including the terms and conditions required under section 1765 of this title.
(e)The Secretary concerned shall issue regulations with respect to the terms and conditions that will be included in rights-of-way pursuant to section 1765 of this title. Such regulations shall be regularly revised as needed. Such regulations shall be applicable to every right-of-way granted or issued pursuant to this subchapter and to any subsequent renewal thereof, and may be applicable to rights-of-way not granted or issued, but renewed pursuant to this subchapter.
(f)Mineral and vegetative materials, including timber, within or without a right-of-way, may be used or disposed of in connection with construction or other purposes only if authorization to remove or use such materials has been obtained pursuant to applicable laws or for emergency repair work necessary for those rights-of-way authorized under section 1761(c) of this title.
(g)The holder of a right-of-way shall pay in advance the fair market value thereof, as determined by the Secretary granting, issuing, or renewing such right-of-way. The Secretary concerned may require either annual payment or a payment covering more than one year at a time except that private individuals may make at their option either annual payments or payments covering more than one year if the annual fee is greater than one hundred dollars. The Secretary concerned may waive rentals where a right-of-way is granted, issued or renewed in consideration of a right-of-way conveyed to the United States in connection with a cooperative cost share program between the United States and the holder. The Secretary concerned may, by regulation or prior to promulgation of such regulations, as a condition of a right-of-way, require an applicant for or holder of a right-of-way to reimburse the United States for all reasonable administrative and other costs incurred in processing an application for such right-of-way and in inspection and monitoring of construction, operation, and termination of the facility pursuant to such right-of-way: Provided, however, That the Secretary concerned need not secure reimbursement in any situation where there is in existence a cooperative cost share right-of-way program between the United States and the holder of a right-of-way. Rights-of-way may be granted, issued, or renewed to a Federal, State, or local government or any agency or instrumentality thereof, to nonprofit associations or nonprofit corporations which are not themselves controlled or owned by profitmaking corporations or business enterprises, or to a holder where he provides without or at reduced charges a valuable benefit to the public or to the programs of the Secretary concerned, or to a holder in connection with the authorized use or occupancy of Federal land for which the United States is already receiving compensation for such lesser charge, including free use as the Secretary concerned finds equitable and in the public interest. Such rights-of-way issued at less than fair market value are not assignable except with the approval of the Secretary issuing the right-of-way. The moneys received for reimbursement of reasonable costs shall be deposited with the Treasury in a special account and are hereby authorized to be appropriated and made available until expended. Rights-of-way shall be granted, issued, or renewed, without rental fees, for electric or telephone facilities eligible for financing pursuant to the Rural Electrification Act of 1936, as amended [7 U.S.C. 901 et seq.], determined without regard to any application requirement under that Act, or any extensions from such facilities: Provided, That nothing in this sentence shall be construed to affect the authority of the Secretary granting, issuing, or renewing the right-of-way to require reimbursement of reasonable administrative and other costs pursuant to the second sentence of this subsection.
(h)(1)The Secretary concerned shall promulgate regulations specifying the extent to which holders of rights-of-way under this subchapter shall be liable to the United States for damage or injury incurred by the United States caused by the use and occupancy of the rights-of-way. The regulations shall also specify the extent to which such holders shall indemnify or hold harmless the United States for liabilities, damages, or claims caused by their use and occupancy of the rights-of-way.
(2)Any regulation or stipulation imposing liability without fault shall include a maximum limitation on damages commensurate with the foreseeable risks or hazards presented. Any liability for damage or injury in excess of this amount shall be determined by ordinary rules of negligence.
(i)Where he deems it appropriate, the Secretary concerned may require a holder of a right-of-way to furnish a bond, or other security, satisfactory to him to secure all or any of the obligations imposed by the terms and conditions of the right-of-way or by any rule or regulation of the Secretary concerned.
(j)The Secretary concerned shall grant, issue, or renew a right-of-way under this subchapter only when he is satisfied that the applicant has the technical and financial capability to construct the project for which the right-of-way is requested, and in accord with the requirements of this subchapter.

Legislative History

Notes & Related Subsidiaries

Editorial Notes

References in Text

The Rural Electrification Act of 1936, referred to in subsec. (g), is act May 20, 1936, ch. 432, 49 Stat. 1363, which is classified generally to chapter 31 (§ 901 et seq.) of Title 7, Agriculture. For complete classification of this Act to the Code, see section 901 of Title 7 and Tables.

Amendments

1996—Subsec. (g). Pub. L. 104–333 substituted “eligible for financing pursuant to the Rural Electrification Act of 1936, as amended, determined without regard to any application requirement under that Act,” for “financed pursuant to the Rural Electrification Act of 1936, as amended,”. 1986—Subsec. (f). Pub. L. 99–545, § 2(1), inserted before the period at end “or for emergency repair work necessary for those rights-of-way authorized under section 1761(c) of this title”. Subsec. (g). Pub. L. 99–545, § 2(2), substituted “The holder of a right-of-way shall pay in advance the fair market value thereof, as determined by the Secretary granting, issuing, or renewing such right-of-way. The Secretary concerned may require either annual payment or a payment covering more than one year at a time except that private individuals may make at their option either annual payments or payments covering more than one year if the annual fee is greater than one hundred dollars. The Secretary concerned may waive rentals where a right-of-way is granted, issued or renewed in consideration of a right-of-way conveyed to the United States in connection with a cooperative cost share program between the United States and the holder.” for “The holder of a right-of-way shall pay annually in advance the fair market value thereof as determined by the Secretary granting, issuing, or renewing such right-of-way: Provided, That when the annual rental is less than $100, the Secretary concerned may require advance payment for more than one year at a time: Provided further, That the Secretary concerned may waive rentals where a right-of-way is granted, issued, or renewed in reciprocation for a right-of-way conveyed to the United States in connection with a cooperative cost share program between the United States and the holder.” 1984—Subsec. (g). Pub. L. 98–300 inserted at end “Rights-of-way shall be granted, issued, or renewed, without rental fees, for electric or telephone facilities financed pursuant to the Rural Electrification Act of 1936, as amended, or any extensions from such facilities: Provided, That nothing in this sentence shall be construed to affect the authority of the Secretary granting, issuing, or renewing the right-of-way to require reimbursement of reasonable administrative and other costs pursuant to the second sentence of this subsection.”

Statutory Notes and Related Subsidiaries

Effective Date

of 1996 Amendment Pub. L. 104–333, div. I, title X, § 1032(b), Nov. 12, 1996, 110 Stat. 4239, provided that: “The amendment made by subsection (a) [amending this section] shall apply with respect to rights-of-way leases held on or after the date of enactment of this Act [Nov. 12, 1996].”

Executive Documents

Transfer of Functions

See note set out under section 1763 of this title.

Reference

Citations & Metadata

Citation

43 U.S.C. § 1764

Title 43Public Lands

Last Updated

Apr 6, 2026

Release point: 119-73