Title 50War and National DefenseRelease 119-73

§167p Helium-3 separation

Title 50 › Chapter CHAPTER 10— - HELIUM GAS › § 167p

Last updated Apr 6, 2026|Official source

Summary

The Secretary must work with the Secretary of Energy (or that person’s designee) on research and assessments about extracting and refining the isotope helium-3 from crude helium and other possible sources. That work can include analyzing gas samples and studying the needed infrastructure. The Secretary, with the Secretary of Energy, may study whether to build a facility to separate helium-3 and look for other sources. Not later than 1 year after October 2, 2013, the Secretary must report the assessment results to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives. Up to $1,000,000 may be provided to carry out this work.

Full Legal Text

Title 50, §167p

War and National Defense — Source: USLM XML via OLRC

(a)The Secretary shall cooperate with the Secretary of Energy, or a designee, on any assessment or research relating to the extraction and refining of the isotope helium-3 from crude helium and other potential sources, including—
(1)gas analysis; and
(2)infrastructure studies.
(b)The Secretary, in consultation with the Secretary of Energy, or a designee, may carry out a study to assess the feasibility of—
(1)establishing a facility to separate the isotope helium-3 from crude helium; and
(2)exploring other potential sources of the isotope helium-3.
(c)Not later than 1 year after October 2, 2013, the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives a report that contains a description of the results of the assessments conducted under this section.
(d)There is authorized to be appropriated to carry out this section $1,000,000.

Reference

Citations & Metadata

Citation

50 U.S.C. § 167p

Title 50War and National Defense

Last Updated

Apr 6, 2026

Release point: 119-73