Notification of Inflation Adjustments for Civil Money Penalties
Published Date: 1/10/2025
Rule
Summary
Starting January 10, 2025, the Office of the Comptroller of the Currency is raising the maximum fines it can charge for certain violations to keep up with inflation. This means anyone facing civil money penalties from the OCC for actions after November 2, 2015, might see higher fines. These updates help keep penalties fair and effective as prices change over time.
Analyzed Economic Effects
6 provisions identified: 0 benefits, 5 costs, 1 mixed.
OCC raises civil money penalty caps
The Office of the Comptroller of the Currency raised its maximum civil money penalties effective January 10, 2025 for conduct on or after November 2, 2015. The OCC applied the OMB inflation multiplier of 1.02598 to the 2024 maximums to calculate the 2025 amounts.
Common Tiered penalties increased to three levels
For many OCC-administered violations, the 2025 maximum per-day penalty amounts are now Tier 1 = $12,567, Tier 2 = $62,829, and Tier 3 = $2,513,215. These tiered amounts apply to multiple statutes listed in the notice starting January 10, 2025 for conduct on or after November 2, 2015.
Post-employment restriction penalty set at $413,388
The maximum penalty for violating post-employment restrictions (12 U.S.C. 1820(k)(6)(A)(ii)) is $413,388 per violation beginning January 10, 2025 for conduct on or after November 2, 2015. This amount is the 2025 inflation-adjusted cap.
Securities-related CMPs vary by person type
For violations under 15 U.S.C. 78u-2(b), the 2025 maximums differ for natural persons and other persons: Tier 1 natural person = $11,823, Tier 1 other person = $118,225; Tier 2 natural = $118,225, Tier 2 other = $591,127; Tier 3 natural = $236,451, Tier 3 other = $1,182,251. These apply to penalties assessed on or after January 10, 2025 for conduct on or after November 2, 2015.
Other specific adjusted penalty amounts (appraisal, flood)
The notice lists other 2025 caps such as Appraisal Independence: first violation $14,435 and subsequent violations $28,866; Flood Insurance violation $2,730. These amounts apply to penalties assessed on or after January 10, 2025 for conduct on or after November 2, 2015.
Pre-2015 conduct subject to older CMP caps
Penalties assessed for violations that occurred before November 2, 2015 remain subject to the OCC's pre-2015 regulatory maximum amounts rather than these 2025 adjusted caps. The 2025 adjustments apply only to conduct on or after November 2, 2015.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Related Federal Register Documents
2026-17390, Automated Commercial Environment (ACE) Electronic Export Manifest for Rail Cargo
U.S. Customs and Border Protection (CBP) is revising its regulations pursuant to the Trade Act of 2002 requiring the transmission of export manifest data electronically in the Automated Commercial Environment (ACE) for cargo transported by rail for any train departing the United States. This rule mandates the electronic transmission of rail export manifest information, identifies the parties eligible to transmit information, and describes the time frames prior to departure in which the information is due. This rule enables CBP to address important cargo security concerns while providing efficiencies to the trade.
2026-17429, Schedules of Controlled Substances: Temporary Placement of Mitragynine Pseudoindoxyl, MGM-15, and MGM-16 in Schedule I
The Drug Enforcement Administration (DEA) is issuing this temporary order to schedule three 7-hydroxymitragynine-related substances (mitragynine pseudoindoxyl, MGM-15, and MGM-16), including their isomers, esters, ethers, salts, and salts of isomers, esters, and ethers, whenever the existence of such isomers, esters, ethers, and salts is possible, in schedule I of the Controlled Substances Act. DEA bases this action on a finding that placing mitragynine pseudoindoxyl, MGM-15, and MGM-16 in schedule I is necessary to avoid an imminent hazard to public safety. This order imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis with, or possess) or propose to handle these three 7-hydroxymitragynine-related substances.
2026-17389, Safety Zone; Lake St. Clair; New Baltimore, MI
The Coast Guard is establishing a temporary safety zone for navigable waters of Lake St. Clair within a 420-foot radius of Brandenburg Park on Anchor Bay in Lake St. Clair, New Baltimore, MI for the Anchor Bay Bass, Brew, BBQ fireworks. The safety zone is needed to protect personnel, vessels, and the marine environment from potential hazards during a fireworks event. Entry of vessels or persons into this zone is prohibited unless specifically authorized by the Captain of the Port Detroit or their designated representative.
2026-17366, Rescinding Portions of the National Foundation on the Arts and Humanities Title VI Regulations To Conform More Closely With the Statutory Text and To Implement Executive Order 14281
This rule amends the National Foundation on the Arts and the Humanities' (the Foundation) regulations implementing Title VI of the Civil Rights Act of 1964 (Title VI) to eliminate disparate-impact liability. These amendments align the conduct prohibited by the Foundation's regulations with Title VI text, avoid constitutional concerns, reduce compliance costs, and serve the public interest. In addition, these revisions are consistent with Executive Order 14281.
2026-17400, Significant New Use Rules on Certain Chemical Substances (24-5.5e)
EPA is issuing significant new use rules (SNURs) under the Toxic Substances Control Act (TSCA) for certain chemical substances that were the subject of premanufacture notices (PMNs) and are also subject to an Order issued by EPA pursuant to TSCA. The SNURs require persons to notify EPA at least 90 days before commencing the manufacture (defined by statute to include import) or processing of any of these chemical substances for an activity that is designated as a significant new use in the SNUR. The required notification initiates EPA's evaluation of the conditions of that use for that chemical substance. In addition, the manufacture or processing for the significant new use may not commence until EPA has conducted a review of the required notification; made an appropriate determination regarding that notification; and taken such actions as required by that determination.
2026-17378, Special Local Regulation; Lake Erie, Kelleys Island, OH
The Coast Guard is establishing a temporary special local regulation (SLR) for certain navigable waters of Lake Erie near Kelleys Island, OH. The SLR is needed to protect personnel, vessels, and the marine environment from potential hazards created by a sailing race. This rulemaking prohibits persons and vessels from being in the regulated area during the enforcement period unless specifically authorized by the Captain of the Port, Sector Detroit or their designated representative.
Previous / Next Documents
Previous: 2025-00371, Airworthiness Directives; The Boeing Company Airplanes
The FAA is making sure certain Boeing 757 airplanes stay safe by fixing a problem with a part that controls power flow. Starting February 14, 2025, airlines must install new relays and update wiring to prevent the power control valve from getting stuck. This update helps avoid potential safety issues and keeps flights running smoothly, with some costs for the fixes but big peace of mind.
Next: 2025-00433, Excess Emissions During Periods of Startup, Shutdown, and Malfunction; Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP)
The EPA planned to ease rules for 13 states about extra pollution during startup, shutdown, and malfunctions but had to hit pause after getting some pushback. Now, they’re withdrawing that change and will revisit the issue later without reopening public comments. This affects state air agencies and could delay any changes to pollution rules and related costs.