Amendment of Class E Airspace; Beckley, WV
Published Date: 1/16/2025
Proposed Rule
Summary
The FAA is updating the Class E airspace around Beckley, WV because they’re retiring an old navigation system called the Beckley VOR. This change helps keep flights safe and smooth for pilots using instruments to fly. If you want to share your thoughts, make sure to comment by March 3, 2025—no costs or fees involved!
Analyzed Economic Effects
3 provisions identified: 3 benefits, 0 costs, 0 mixed.
Beckley Class E Airspace Redrawn
The FAA proposes to change the Class E airspace at Raleigh County Memorial Airport (Beckley, WV) because the Beckley VOR is being removed. Changes include a 4.3-mile surface-area radius with multiple 1-mile-wide bearing extensions (to 5.2, 4.9, 5.0, and 5.1 miles on specified bearings) and a reduction of the 700-foot-above-surface airspace radius from 7.0 miles to 6.8 miles plus new 2-mile-wide bearing extensions reaching up to 8.9 and 8.8 miles. The amendment is intended to bring the airspace into compliance with FAA orders and to support instrument flight rules (IFR) procedures and operations at the airport.
FAA Says Minimal Impact on Small Entities
The FAA certified that this proposed airspace amendment is a routine technical change and "will not have a significant economic impact on a substantial number of small entities" under the Regulatory Flexibility Act. The agency says the anticipated impact is minimal and does not warrant a regulatory evaluation.
Beckley VOR Decommissioned (VOR MON)
The Beckley VOR is being decommissioned as part of the VOR Minimum Operational Network (MON) Program, and the proposed airspace changes result from that decommissioning. The change is intended to support IFR procedures and keep instrument flight operations safe and operationally current.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Related Federal Register Documents
2026-17655, Passports: Expanding Online Passport Renewal Overseas
The Department proposes to amend 22 CFR 51.21 by consolidating requirements for persons applying by mail and online in the United States and overseas. This proposed change includes expanding online passport application availability to qualified applicants located in foreign countries. In addition, the Department is proposing to remove the requirement that an applicant's most recently issued passport must have a year or less of remaining validity to qualify to submit an online passport application. Finally, the Department is proposing technical corrections to 51.8(b) to change "on-line" to read "online" for consistency.
2026-17609, Airworthiness Directives; Embraer S.A. Airplanes
The FAA proposes to adopt a new airworthiness directive (AD) for certain Embraer S.A. Model EMB-545 and EMB-550 airplanes. This proposed AD was prompted by the possibility of the Ram Air Turbine (RAT) compartment door seal peeling off and becoming entangled with the RAT rotor. This proposed AD would require replacement of the RAT compartment door seal. The FAA is proposing this AD to address the unsafe condition on these products.
2026-17641, Federal Sector Equal Employment Opportunity
The Equal Employment Opportunity Commission (EEOC) proposes revising Federal sector EEO complaint rules to streamline processing, improve effectiveness, and implement the Cummings Act. The rule would end mandatory pre complaint counseling and remove the option to request administrative judge proceedings before a final agency decision. Complainants could seek such proceedings only on appeal, and the EEOC would order them only when necessary or efficient. The rule would bar administrative class complaint adjudication while preserving putative class assertions for exhaustion. The rule also allows joint processing of related individual complaints and updates pleading standards, mixed case procedures, attorney fee provisions, and required reports.
2026-17649, Disclosure of Information; Extension of Comment Period
The FDIC is extending the public comment period on the proposed rule "Disclosure of Information," which was published in the Federal Register on June 30, 2026. FDIC is extending the public comment period from August 31, 2026, to October 5, 2026, to provide interested parties with additional time to analyze the proposal and prepare comments.
2026-17661, Special Conditions: Skyryse, Robinson Helicopter Company Model R66 Helicopter; Control Margin Awareness
This action proposes special conditions for the Robinson Helicopter Company (Robinson) Model R66 helicopter. This helicopter, as modified by Skyryse, will have a novel or unusual design feature when compared to the state of technology envisioned in the airworthiness standards for normal category helicopters. This design feature replaces the mechanical flight controls with a digital fly-by-wire FBW system. The applicable airworthiness regulations do not contain adequate or appropriate safety standards for this design feature. These proposed special conditions contain the additional safety standards that the Administrator considers necessary to establish a level of safety equivalent to that established by the existing airworthiness standards.
2026-17499, Air Plan Approval; Oklahoma; Regional Haze Plan for the First Implementation Revision; Revision to State Implementation Plan and Requirements
Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is proposing to approve the State implementation plan (SIP) revision submitted by the State of Oklahoma on March 12, 2026, (Oklahoma's 2026 SIP submission) for the regional haze program's first implementation (planning) period. Oklahoma's 2026 SIP submission revises previously approved source-specific requirements for the American Electric Power/Public Service of Oklahoma (AEP/PSO) Northeastern Power Station as part of the State's long-term strategy for the first planning period. The EPA is proposing to find that this SIP revision meets the requirements of the CAA and the Regional Haze Rule.
Previous / Next Documents
Previous: 2025-00847, Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments; Correction
The EPA is fixing mistakes and clearing up confusing parts of a 2024 rule about how old coal ash ponds must be handled. This affects electric utilities that manage coal waste, making sure they follow safer cleanup rules. You’ve got until March 17, 2025, to share your thoughts, and these changes help protect the environment without adding surprise costs.
Next: 2025-00981, Affirmatively Furthering Fair Housing; Withdrawal
HUD has decided to stop moving forward with a rule called "Affirmatively Furthering Fair Housing" that was proposed in 2023. This means communities and housing programs won’t have new federal requirements for fair housing planning or enforcement right now. The withdrawal takes effect January 16, 2025, and no new costs or deadlines come from this change at this time.