The Nuclear Regulatory Commission is updating the rules for the NAC International MAGNASTOR spent fuel storage system with Amendment No. 15. This update adds new designs, improves safety features, and supports more types of nuclear fuel, helping keep spent fuel storage safer and more efficient. These changes take effect on June 3, 2025, and affect companies using this storage system, with no extra costs announced.
Analyzed Economic Effects
7 provisions identified: 7 benefits, 0 costs, 0 mixed.
New loading permission effective June 3, 2025
If you are a power reactor licensee holding the general license under 10 CFR 72.210, you may load spent nuclear fuel into MAGNASTOR casks that meet Amendment No. 15 starting June 3, 2025. The NRC will consider significant adverse comments only if received by April 21, 2025.
Expanded heat and fuel acceptance limits
Amendment No. 15 increases allowable heat loads and fuel acceptance: it increases the Passive MAGNASTOR Transfer Cask heat load from 30 kilowatts (kW) to 35.5 kW (including preferential loading pattern B), increases the maximum system heat load capacity, adds new PWR loading patterns L, M and N (N is a short pattern), and adds new BWR loading patterns E and F.
Removal of 5% burnup penalty
Amendment No. 15 explicitly removes the 5 percent burnup 'penalty' from the certificate of compliance.
Applies only to new casks; current users unchanged
Amendment No. 15 applies only to new MAGNASTOR casks fabricated and used under Amendment No. 15; current users remain covered by Amendment No. 14 and are not required to adopt the new amendment. Existing users may choose to comply with Amendment No. 15 voluntarily.
New cask designs and technical-spec changes allowed
The amendment adds a Reduced Width Lightweight MAGNASTOR Transfer Cask variation and a new concrete cask design CC8 (using high density concrete for enhanced shielding), modifies the transportable storage canister lid clearance near the top center of the basket, and revises drawings plus Technical Specifications Appendix A and B (including removal of cool-time tables B2-13 through B2-43).
No significant environmental or radiological impacts found
The NRC determined the Amendment No. 15 changes will not significantly change effluent releases, occupational or offsite radiation exposures, or the potential consequences from radiological accidents, and found no significant environmental impact.
Approval avoids exemption costs for licensees
If Amendment No. 15 were denied, general licensees seeking to use the described changes would need to request exemptions from 10 CFR 72.212 and 72.214, which the NRC says would increase administrative burden and costs to each licensee; approval avoids that additional cost and burden.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-19568, Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight
The Nuclear Regulatory Commission is updating rules for nuclear reactor licensing, shutting down old reactors, and keeping an eye on operations to make everything safer and clearer. These changes affect reactor operators and companies involved in decommissioning, with a public comment deadline on November 9, 2026. The updates aim to streamline processes and improve oversight without signaling big cost changes yet.
2026-14341, Modernizing Reactor Licensing, Safety Oversight, and Siting Practices
The Nuclear Regulatory Commission is updating the rules for how nuclear reactors get licensed, checked for safety, and where they can be built. These changes will make the process faster and clearer, helping new clean energy get on the grid sooner. If you want to share your thoughts, you have until August 31, 2026, to comment—this could also save money by cutting red tape!
2026-13687, Implementation of the National Environmental Policy Act
The Nuclear Regulatory Commission is updating how it follows the National Environmental Policy Act to make reviews faster, clearer, and less of a hassle. These changes affect anyone applying for nuclear licenses or permits, cutting down on paperwork and focusing only on important environmental impacts. You’ve got until August 21, 2026, to share your thoughts before the new rules take shape!
2026-12067, Fee Schedules; Fee Recovery for Fiscal Year 2026
The Nuclear Regulatory Commission is updating its fees for licenses, inspections, and special projects starting August 17, 2026. These changes make sure the NRC covers nearly all its costs while setting clear fee limits to keep prices predictable and fair. If you hold a license or apply for one, expect some fee adjustments that help the NRC run smoothly and efficiently.
2026-08550, Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles
The Nuclear Regulatory Commission is making it easier and faster to get licenses for small nuclear reactors, called microreactors, by creating simpler rules that match their lower risks. This change helps companies build more of these reactors quickly while keeping safety strong. If you’re involved in making or using these reactors, get ready to share your thoughts by June 15, 2026, and expect a smoother, less costly approval process soon.
2026-08015, Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
The Nuclear Regulatory Commission just updated the rules for checking the environmental impact of new nuclear reactors. This makes it easier and faster to review many reactors by using a common set of environmental factors, while still looking closely at unique site details. The new rules kick in on May 26, 2026, helping companies save time and money when applying to build new reactors.
Previous / Next Documents
Previous: 2025-04475, Energy Conservation Program: Energy Conservation Standards for Consumer Gas-Fired Instantaneous Water Heaters
The Department of Energy is pushing back the start date for new energy-saving rules on gas-fired instant water heaters from March 21 to May 20, 2025. This delay gives everyone more time to review and comment on the changes, which aim to save energy and money in the long run. If you make, sell, or buy these water heaters, this extra time matters for planning and costs.
Next: 2025-04664, Special Conditions: Canard Aerospace Corporation, DeHavilland Model DHC-8-400 Series Airplane; Electronic System Security Protection From Unauthorized External Access
Canard Aerospace is upgrading the DeHavilland DHC-8-400 airplane with a new digital system that connects to external networks like the internet and wireless devices. Because this tech is new and different, the FAA is setting special safety rules to keep everything secure from hackers or unauthorized access. These rules take effect on March 20, 2025, and Canard must follow them to keep the plane safe without extra costs for passengers.