The EPA says WRB Refining in Texas can treat 7,000 cubic yards of stormwater sludge as non-hazardous waste, so it won’t need special hazardous waste rules. This change means WRB can save money and handle the waste more easily, but they must keep testing to make sure the waste stays safe. This rule kicks in right away and only applies to WRB’s Borger facility.
Analyzed Economic Effects
1 provisions identified: 1 benefits, 0 costs, 0 mixed.
One-time delist of 7,000 cubic yards
The EPA has approved a one-time delisting allowing WRB Refining’s Borger, Texas facility to exclude 7,000 cubic yards of F037 (petroleum refinery stormwater sludge) solids from hazardous waste regulations. The waste may be disposed of in Subtitle D landfills, the rule is effective immediately, and WRB must follow testing conditions to ensure future-generated waste continues to qualify for the delisting.
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-10085 — Rescission of Regulatory Determinations and Removal of Related Provisions for Four PFAS Substances (PFHxS, PFNA, HFPO-DA (GenX), and the Mixture of These Three PFAS Plus PFBS)
The EPA is proposing to undo its rules for four PFAS chemicals (PFHxS, PFNA, GenX, and a mix including PFBS) in drinking water because the original process wasn’t done right. This means public water systems won’t have to monitor or treat these chemicals for now. People and water providers should weigh in by July 20, 2026, and a virtual hearing happens July 7.
2026-10086 — Extending the Compliance Deadline for the PFOA and PFOS Maximum Contaminant Levels
The EPA is giving water systems more time to meet safety rules for two harmful chemicals, PFOA and PFOS, by extending the deadline from April 2029 to April 2031 if they ask for it. This helps water providers get ready without rushing, keeping our drinking water safe. The EPA wants your thoughts and will hold a public hearing in July 2026 to hear from everyone.
2026-09895 — Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category-Unmanaged Combustion Residual Leachate
The EPA is updating rules for steam electric power plants to better control dirty water leaking from leftover coal waste. This change affects existing power plants and is expected to save up to $1 billion a year while protecting water quality. Comments on the proposal are open until June 17, 2026, so now’s the time to speak up!
2026-09524 — Begin Actual Construction in the New Source Review (NSR) Preconstruction Permitting Program
The EPA is updating rules about when companies can start building big projects that might affect air quality. Now, they can begin building parts that don’t release pollution before getting a full air permit, making things clearer and easier. This change mainly affects businesses planning major construction and could speed up projects without extra costs, but comments are due by June 29, 2026.
2026-09179 — Definition of Hazardous Waste Applicable to Corrective Action for Releases From Solid Waste Management Units; Withdrawal
The EPA has decided to cancel its plan to change the rules about what counts as hazardous waste for cleaning up pollution at certain waste sites. This means businesses and cleanup crews won’t have to deal with the confusing new rules that were proposed. The withdrawal takes effect immediately, so no extra costs or changes will happen right now.
2026-08750 — Extension of Postponement of Effectiveness for Certain Provisions of Trichloroethylene (TCE); Regulation Under the Toxic Substances Control Act (TSCA)
The EPA is hitting the pause button again on some rules about a chemical called TCE, which is used in workplaces. This means certain limited uses of TCE won’t have to follow new restrictions just yet, while courts review the rules. If you work with TCE, this delay gives you more time before changes kick in, starting May 18, 2026.
Previous / Next Documents
Previous: 2025-11057 — Form PF; Reporting Requirements for All Filers and Large Hedge Fund Advisers; Further Extension of Compliance Date
If you’re a big hedge fund or private fund adviser, good news! The deadline to follow new rules for filing Form PF just got pushed back from June 12 to October 1, 2025. This gives you more time to get your reports right without rushing, keeping your money moves smooth and compliant.
Next: 2025-10962 — Equal Access to Justice Act in Postal Service Proceedings
This update makes it clearer how people can ask for a second look at fee decisions in Postal Service contract disputes. If you’re involved in these cases, you’ll know exactly how to request reconsideration. This change helps speed things up and keeps the process fair without extra costs or delays.