EPA Clears Ohio Company to Inject Hazardous Waste for 10,000 Years
Published Date: 7/31/2025
Notice
Summary
The EPA has given Vickery Environmental, Inc. in Ohio the green light to keep safely injecting certain hazardous wastes underground through five special wells for at least 10,000 years. This means VEI can continue their work without interruption starting July 31, 2025, as long as they follow the rules. This decision affects VEI directly and ensures drinking water stays protected, with no extra costs or appeals allowed.
Analyzed Economic Effects
5 provisions identified: 4 benefits, 1 costs, 0 mixed.
EPA Finds No Migration to Drinking Water
EPA determined, to a reasonable degree of certainty, that hazardous constituents injected by VEI will not migrate out of the injection zone or into an underground source of drinking water (USDW) for at least 10,000 years. The lowest USDW is at a depth of 602 feet below ground level; the approved injection interval is the Mt. Simon Sandstone between 2,791 and 2,950 feet bgl.
VEI Allowed to Continue Injection
Vickery Environmental, Inc. (VEI) in Vickery, Ohio is allowed to continue underground injection of hazardous wastes through five Class I wells (#2, #4, #5, #6, and #8) effective July 31, 2025. The exemption applies only to hazardous wastes designated by the RCRA waste codes listed in Table 1 of the decision.
Operational Limits and Chemical Caps
The exemption limits injection to the part of the Mt. Simon Sandstone at depths between 2,791 and 2,950 feet bgl, allows only RCRA waste codes in Table 1, and caps chemical concentrations at the values listed in Table 2. VEI must maintain an average specific gravity of injected waste no less than 1.08 over a one-year period and may inject up to a combined total of 240 gallons per minute into the five wells based on a monthly average.
Monitoring, Reporting, and Compliance Duties
VEI must meet ongoing conditions including submitting, within 90 days, an approvable plan to demonstrate Table 2 chemical limits are not exceeded; providing copies of annual bottom-hole pressure surveys, annual radioactive tracer surveys, and annulus pressure test reports to EPA when submitted to Ohio EPA; notifying EPA in writing if any well loses mechanical integrity; and complying with specified Ohio Underground Injection Control permits.
Time Limit and Reissuance Deadline
The exemption is approved for the 20-year modeled injection period ending June 30, 2027. VEI may petition EPA for reissuance beyond that date provided EPA Region 5 receives a new and complete petition and no-migration demonstration by January 31, 2027.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-22082, Additional Reconsideration Standards of Performance for New, Reconstructed, and Modified Sources and Emissions Guidelines for Existing Sources: Oil and Natural Gas Sector Climate Review
The EPA is updating rules for oil and natural gas companies to fix issues from last year’s changes. They’re scrapping the Super Emitter Program, splitting well sites into clearer groups, and tweaking rules on leaks, equipment, and inspections. Companies should get ready to comment by December 16, 2026, as these updates could affect how they manage emissions and operate equipment.
2026-21155, Renewable Fuel Standard (RFS) Program: Reallocation of Additional 2025 Small Refinery Exemptions
The EPA is updating how it handles small refinery exemptions (SREs) for 2025 under the Renewable Fuel Standard. They’re deciding whether to spread the extra exemptions between 2026 and 2027 or give them all to 2027. This change might also push back the 2026 compliance deadline, affecting refiners and renewable fuel producers with potential timing and cost impacts.
2026-20849, Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes To Reflect Administration Policy
The EPA is giving facilities more time to meet new Clean Water Act rules for handling hazardous spills, pushing back the deadline to help them get ready. They’re also removing mentions of climate change and environmental justice to match new government policies. This delay helps facilities plan better without rushing and lets the EPA rethink the rules if needed.
2026-19071, Partial Repeal of the Carbon Pollution Standards for Fossil Fuel-Fired Electric Generating Units
The EPA is rolling back most of the 2024 rules that limited carbon pollution from fossil fuel power plants. This change affects coal and gas plants by easing some strict limits on emissions and carbon capture technology. The new rules kick in on November 16, 2026, potentially saving money for power plants but raising questions about pollution control.
2026-19072, Rescission of the Greenhouse Gas Findings for Fossil Fuel-Fired Power Plants and Repeal of Regulations for Power Plant Greenhouse Gas Emissions Under Clean Air Act Section 111
The EPA is proposing to cancel all greenhouse gas rules for fossil fuel power plants, saying the law doesn’t let them regulate these emissions for climate reasons. This change affects power plants across the U.S. and could impact future pollution limits and costs. Comments on this proposal are open until November 2, 2026, so now’s the time to speak up!
2026-18317, Updated Definition of “Waters of the United States”
The purpose of this supplemental notice of proposed rulemaking is for the U.S. Environmental Protection Agency (EPA) and the Department of the Army ("the agencies") to supplement and seek additional comment on certain aspects of an earlier proposal, published on November 20, 2025, to revise the regulations defining the scope of waters federally covered under the Clean Water Act in light of the U.S. Supreme Court's 2023 decision in Sackett v. Environmental Protection Agency. As stated in the agencies' November 20, 2025 Notice of Proposed Rulemaking (NPRM), the agencies intend for this rulemaking to provide greater regulatory certainty and increase Clean Water Act program predictability and consistency by clarifying the definition of "waters of the United States." After consideration of the public comments received on the NPRM, the agencies are issuing this notice to supplement the NPRM with additional regulatory options on certain aspects of the proposed rule.
Previous / Next Documents
Previous: 2025-14471, Agency Information Collection Activities; Submission to the Office of Management and Budget (OMB) for Review and Approval; Comment Request; Emergency Beacon Registrations
If you own a 406 MHz emergency beacon, you need to register it with NOAA so rescuers can find you fast in an emergency. NOAA is updating and extending this registration process, which affects over 370,000 people and takes about 15 minutes to complete. They’re asking for public feedback for 30 more days to keep things smooth and save money by avoiding false alarms.
Next: 2025-14474, Guidance on Referrals for Potential Criminal Enforcement
The EPA is updating how it handles cases where people might have broken environmental laws that could lead to criminal charges. By May 9, 2026, the EPA will share a detailed report listing these offenses, their penalties, and the required proof to convict. This helps make sure enforcement is fair, clear, and focused on serious harm, affecting businesses and individuals who deal with environmental rules.