EPA OKs New Tools for Sniffing Out Air Pollutants
Published Date: 9/5/2025
Notice
Summary
The EPA just approved four new ways to check air pollution levels, including sulfur dioxide, nitrogen dioxide, and tiny particles in the air. This update helps scientists and air quality experts get better, faster readings to keep our air safe. If you work in air monitoring, these new methods are ready to use now and could save time and money.
Analyzed Economic Effects
1 provisions identified: 1 benefits, 0 costs, 0 mixed.
Four new air monitoring methods approved
The EPA designated one new equivalent method for measuring sulfur dioxide (SO2), one new reference method for measuring nitrogen dioxide (NO2), one new equivalent method for measuring PM2.5, and one new equivalent method for measuring PM10-2.5 in ambient air. These methods are ready to use now, and the Agency says they can give better, faster readings and could save time and money for people who work in air monitoring.
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-10086 — Extending the Compliance Deadline for the PFOA and PFOS Maximum Contaminant Levels
The EPA is giving water systems more time to meet safety rules for two harmful chemicals, PFOA and PFOS, by extending the deadline from April 2029 to April 2031 if they ask for it. This helps water providers get ready without rushing, keeping our drinking water safe. The EPA wants your thoughts and will hold a public hearing in July 2026 to hear from everyone.
2026-10085 — Rescission of Regulatory Determinations and Removal of Related Provisions for Four PFAS Substances (PFHxS, PFNA, HFPO-DA (GenX), and the Mixture of These Three PFAS Plus PFBS)
The EPA is proposing to undo its rules for four PFAS chemicals (PFHxS, PFNA, GenX, and a mix including PFBS) in drinking water because the original process wasn’t done right. This means public water systems won’t have to monitor or treat these chemicals for now. People and water providers should weigh in by July 20, 2026, and a virtual hearing happens July 7.
2026-09895 — Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category-Unmanaged Combustion Residual Leachate
The EPA is updating rules for steam electric power plants to better control dirty water leaking from leftover coal waste. This change affects existing power plants and is expected to save up to $1 billion a year while protecting water quality. Comments on the proposal are open until June 17, 2026, so now’s the time to speak up!
2026-09524 — Begin Actual Construction in the New Source Review (NSR) Preconstruction Permitting Program
The EPA is updating rules about when companies can start building big projects that might affect air quality. Now, they can begin building parts that don’t release pollution before getting a full air permit, making things clearer and easier. This change mainly affects businesses planning major construction and could speed up projects without extra costs, but comments are due by June 29, 2026.
2026-09179 — Definition of Hazardous Waste Applicable to Corrective Action for Releases From Solid Waste Management Units; Withdrawal
The EPA has decided to cancel its plan to change the rules about what counts as hazardous waste for cleaning up pollution at certain waste sites. This means businesses and cleanup crews won’t have to deal with the confusing new rules that were proposed. The withdrawal takes effect immediately, so no extra costs or changes will happen right now.
2026-08750 — Extension of Postponement of Effectiveness for Certain Provisions of Trichloroethylene (TCE); Regulation Under the Toxic Substances Control Act (TSCA)
The EPA is hitting the pause button again on some rules about a chemical called TCE, which is used in workplaces. This means certain limited uses of TCE won’t have to follow new restrictions just yet, while courts review the rules. If you work with TCE, this delay gives you more time before changes kick in, starting May 18, 2026.
Previous / Next Documents
Previous: 2025-17078 — Notice of Final Federal Agency Actions on Transportation Project in Nebraska
The Lincoln/Lancaster County Railroad Safety District is making big changes to roads and railroad crossings in Lincoln, Nebraska. They’re closing some crossings, building a new bridge over the train tracks, and widening Cornhusker Highway to six lanes. These improvements will make travel safer and smoother, with all approvals now final and ready to roll!
Next: 2025-17082 — Notice of Final Federal Agency Actions on Transportation Project in Nebraska
The Nebraska Department of Transportation is ready to upgrade the highway between Norfolk and Wisner from two lanes to a faster, safer four-lane expressway. This big project got all the green lights and permits it needs to start soon, improving travel for drivers in Stanton and Cuming Counties. Expect smoother rides and better connections without major delays or extra costs announced yet.