EPA Approves Wyoming's Coal Ash Permit Takeover
Published Date: 2/26/2026
Rule
Summary
Wyoming’s new coal ash permit program just got the EPA’s thumbs-up and will start on March 30, 2026. This means Wyoming will handle coal ash rules instead of the federal government, making things smoother for local businesses and communities. If you’re involved with coal ash in Wyoming, get ready for some fresh rules and oversight that keep the environment safer without slowing down progress.
Analyzed Economic Effects
7 provisions identified: 3 benefits, 4 costs, 0 mixed.
Permit Timing and 30-Year Post-Closure Rule
Wyoming requires owners/operators to obtain permits for all existing and new CCR units and sets permit durations for operating life through post-closure; closure permits include a minimum 30-year post-closure term. Existing landfills must apply for renewal at least 12 months before permit expiration.
State Enforcement and Penalties
WDEQ has enforcement authority including inspections, investigations, injunctions, and civil penalties for violations of the Act or permits. Penalties may be assessed up to $10,000 for each violation for each day the violation continues.
Wyoming Takes Over Coal Ash Permitting
EPA approved Wyoming's partial coal combustion residuals (CCR) permit program and it will operate in lieu of the Federal CCR permit program (except for specific provisions) starting March 30, 2026. If you own or run a coal-ash unit in Wyoming, state permits and state oversight will now be the main regulatory pathway instead of a full federal permitting process.
Permits Replace Federal Rules (Permit Shield)
Once Wyoming issues a final CCR permit for a unit, the permit terms apply in place of the corresponding Federal CCR requirements and provide a permit shield against direct enforcement of those Federal rules. The permit becomes the enforceable document for the permittee.
Some Federal Rules Still Apply
Wyoming's approval is partial: Federal CCR provisions that Wyoming did not seek approval for will continue to apply directly to CCR units in Wyoming. EPA noted additional provisions tied to the 2024 Legacy Rule remain federal obligations for affected units.
State Inspection and Information Access
Under Wyoming law, WDEQ may inspect CCR facilities, copy records, inspect monitoring equipment, and require applicants to provide access authorization before a permit is issued. WDEQ must notify applicants within 60 days whether an application is complete and completes technical review within 90 days.
Public Notice and Two Comment Periods
Permit applicants must provide public notice and two 30-day comment periods: one after the application is deemed complete and another when a proposed permit is issued. Notices must be published for two consecutive weeks and sent to landowners within one-half mile, local officials within 50 miles, and posted on the WDEQ website.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-18317, Updated Definition of “Waters of the United States”
The purpose of this supplemental notice of proposed rulemaking is for the U.S. Environmental Protection Agency (EPA) and the Department of the Army ("the agencies") to supplement and seek additional comment on certain aspects of an earlier proposal, published on November 20, 2025, to revise the regulations defining the scope of waters federally covered under the Clean Water Act in light of the U.S. Supreme Court's 2023 decision in Sackett v. Environmental Protection Agency. As stated in the agencies' November 20, 2025 Notice of Proposed Rulemaking (NPRM), the agencies intend for this rulemaking to provide greater regulatory certainty and increase Clean Water Act program predictability and consistency by clarifying the definition of "waters of the United States." After consideration of the public comments received on the NPRM, the agencies are issuing this notice to supplement the NPRM with additional regulatory options on certain aspects of the proposed rule.
2026-14112, Amendments and Nonconformance Penalties for Model Year 2027 and Later Heavy-Duty Highway Engines and Amendments to Inducement Provisions for SCR-Equipped Diesel Engines
Starting with model year 2027, the EPA is updating rules for big truck engines to make sure they last longer and pollute less. They’re also letting engine makers pay penalties if their engines don’t meet standards, and tightening rules for special pollution-control systems on diesel engines. These changes affect truck and engine makers and kick in soon, with public feedback due by August 29, 2026.
2026-13667, Minor New Source Review Program Air Permitting Public Participation Requirements for State Implementation Plans
The EPA wants to give states more freedom to decide how much public input is needed when approving small air pollution sources or changes. This means local air agencies can tailor public participation to fit their community’s needs while still protecting air quality. If you’re involved in air permits, watch for comment deadlines and possible virtual hearings this summer!
2026-13263, Revisions To Establish the Sixth Unregulated Contaminant Monitoring Rule (UCMR 6) for Public Water Systems
The EPA is rolling out the sixth Unregulated Contaminant Monitoring Rule (UCMR 6) to check for new, sneaky chemicals in public drinking water. Big water systems serving 3,300+ people and some smaller ones will test for 30 different contaminants, including certain PFAS and pesticides, to keep our water safe. Comments and feedback are open until late August 2026, and the EPA will host fun online meetings to chat about the plan!
2026-12927, U.S. Ecology Nevada, Inc. High Mercury Subcategory Wastes Land Disposal Restrictions Variance
The EPA is giving U.S. Ecology Nevada a special green light to handle and dispose of high-mercury waste a bit differently than usual. This means mercury waste treated in Pennsylvania can now be safely sent to U.S. Ecology’s Nevada site for disposal under new rules starting July 27, 2026. This change helps protect people and the environment while keeping mercury waste management efficient and cost-effective.
2026-11047, National Emission Standards for Hazardous Air Pollutants From Hazardous Waste Combustors: Residual Risk and Technology Review
The EPA just updated rules for places that burn hazardous waste, like incinerators and boilers, to keep the air safe and clean. They confirmed current standards work well but added new limits on harmful gases like hydrogen fluoride and hydrogen cyanide. These changes start June 3, 2026, and include easier electronic reporting and some new rules for startup and shutdown times—helping protect health without big costs.
Previous / Next Documents
Previous: 2026-03799, Airworthiness Directives; Aerospace & Defense Oxygen Systems SaS (Part of Safran Aerosystems) (Formerly Known as Air Liquide) Portable Breathing Equipment (PBE)
The FAA is making a new rule to fix a problem with certain Aerospace & Defense Oxygen Systems SaS portable breathing equipment (PBE) that sometimes don’t deliver oxygen when needed. If you use this gear, you’ll have to replace the faulty units and can’t install the old ones anymore. This rule kicks in on March 12, 2026, and the FAA wants your feedback by April 13, 2026.
Next: 2026-03844, Delegations of Authority
The FCC just boosted the power of its Chairman and Managing Director to settle certain claims without needing a full Commission vote. Now, they can handle Federal Tort Claims up to $25,000 and Military Personnel claims up to $40,000, matching federal law limits. These changes take effect on February 26, 2026, making claim settlements faster and more efficient—no extra costs or paperwork for small businesses.