EPA Eyes Handing Alaska Control of Hazardous Waste Program
Published Date: 5/14/2026
Proposed Rule
Summary
Alaska wants to take charge of managing its hazardous waste instead of the federal government. The EPA thinks Alaska’s plan meets all the rules and is ready to give final approval, but they’re asking for public comments until July 2, 2026. If approved, Alaska will run the program, but the EPA will still handle certain federal lands and Native areas.
Analyzed Economic Effects
8 provisions identified: 3 benefits, 3 costs, 2 mixed.
New State Reporting for Generators and Transporters
Alaska's program adds annual reporting/notification requirements for Small Quantity Generators (SQGs), Large Quantity Generators (LQGs), and Transporters under 18 AAC 62.301(a)(2), 18 AAC 62.430, and 18 AAC 62.840(b). These state reporting duties are in addition to Federal rules.
Electronic Waste Treated as Universal Waste
Alaska added electronic items (e.g., computers, laptops, cell phones, monitors) to its universal waste rules (18 AAC 62.205, .1110, .1135, .1390), which can exempt qualifying electronic waste from standard hazardous waste requirements and let Small Quantity and Very Small Quantity Generators maintain a less complex generator status.
State Siting Rules for New Hazardous Facilities
Alaska's siting requirements (18 AAC 63) require owners/operators for new hazardous waste facilities to begin siting steps not fewer than 365 days before construction and include minimum setback, financial assurance, and public participation conditions. These State siting rules are broader in scope than Federal rules.
State Takes Over Hazardous Waste Program
The EPA tentatively plans to grant Alaska final authorization to run its hazardous waste program in place of the Federal program if finalized by August 24, 2026. If finalized, Alaska will issue permits and enforce most hazardous waste rules in the State, while the EPA will still retain authority for Indian country and certain federal areas.
EPA Keeps Authority Over Indian Country
Even if Alaska is authorized, the EPA will continue to implement the Federal hazardous waste program in Indian country (18 U.S.C. 1151) and areas of exclusive Federal jurisdiction in Alaska; the State does not assert authority over Indian country.
Some Federal Rules Stay with EPA (Manifests, Import/Export)
Alaska is not seeking authorization for certain Federal regulations (for example, import/export at 40 CFR part 262 subpart H, manifest registry and e-manifest-related functions at 40 CFR part 262 subpart B and related parts), so the EPA will continue to implement and enforce those requirements in Alaska.
Transition of Existing EPA Permits
If Alaska is authorized, the EPA will continue to administer any RCRA hazardous waste permits or portions of permits it issued prior to the effective date of authorization until those permits expire or are terminated; Alaska will incorporate or replace those permits when it issues State permits.
EPA Says No Significant Small-Entity Impact
The EPA certified under the Regulatory Flexibility Act that this proposed authorization will not have a significant economic impact on a substantial number of small entities because it does not impose new requirements beyond State law.
Your PRIA Score
Personalized for You
How does this regulation affect your finances?
Sign up for a PRIA Policy Scan to see your personalized alignment score for this federal register document and every other regulation we track. We analyze your financial profile against policy provisions to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-09895 — Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category-Unmanaged Combustion Residual Leachate
The EPA is updating rules for steam electric power plants to better control dirty water leaking from leftover coal waste. This change affects existing power plants and is expected to save up to $1 billion a year while protecting water quality. Comments on the proposal are open until June 17, 2026, so now’s the time to speak up!
2026-09524 — Begin Actual Construction in the New Source Review (NSR) Preconstruction Permitting Program
The EPA is updating rules about when companies can start building big projects that might affect air quality. Now, they can begin building parts that don’t release pollution before getting a full air permit, making things clearer and easier. This change mainly affects businesses planning major construction and could speed up projects without extra costs, but comments are due by June 29, 2026.
2026-09179 — Definition of Hazardous Waste Applicable to Corrective Action for Releases From Solid Waste Management Units; Withdrawal
The EPA has decided to cancel its plan to change the rules about what counts as hazardous waste for cleaning up pollution at certain waste sites. This means businesses and cleanup crews won’t have to deal with the confusing new rules that were proposed. The withdrawal takes effect immediately, so no extra costs or changes will happen right now.
2026-08750 — Extension of Postponement of Effectiveness for Certain Provisions of Trichloroethylene (TCE); Regulation Under the Toxic Substances Control Act (TSCA)
The EPA is hitting the pause button again on some rules about a chemical called TCE, which is used in workplaces. This means certain limited uses of TCE won’t have to follow new restrictions just yet, while courts review the rules. If you work with TCE, this delay gives you more time before changes kick in, starting May 18, 2026.
2026-07061 — Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy/CCRMU Amendments
The EPA is updating rules on how electric utilities handle coal waste, making it easier to manage and reuse safely. These changes affect power plants and waste managers by allowing more flexible cleanup and reuse options, with a public comment deadline on June 12, 2026. The updates could save money and speed up cleanup while protecting the environment.
2026-06808 — Reconsideration of Standards of Performance for New, Reconstructed, and Modified Sources and Emissions Guidelines for Existing Sources: Oil and Natural Gas Sector Climate Review
The EPA is making some technical fixes to rules for oil and natural gas companies about how they handle gas flaring and monitoring. These changes don’t change pollution limits but clarify how to report and test emissions. The new rules take effect June 8, 2026, helping companies stay on track without extra costs or delays.
Previous / Next Documents
Previous: 2026-09576 — Airworthiness Directives; Pilatus Aircraft Ltd. Airplanes
Pilatus PC-24 airplane owners need to fix a windshield heater problem that could cause electrical issues. The FAA wants to replace a faulty part called a solid-state relay to keep flights safe. Comments on this fix are open until June 29, 2026, and the update might cost some time and money but keeps everyone flying worry-free.
Next: 2026-09604 — Determination of Attainment by the Attainment Date and Clean Data Determination for the 2012 Annual Fine Particulate Standard; Plumas County, California
The EPA says Plumas County’s Portola area cleaned up its air and met the 2012 fine particle pollution standards by the end of 2025. This means some strict pollution rules can take a break as long as the air stays clean. Residents and local businesses should watch for final approval and can share their thoughts by June 15, 2026.