EPA slaps new rules on mystery chemicals 24-5.5e
Published Date: 8/26/2026
Rule
Summary
EPA is issuing significant new use rules (SNURs) under the Toxic Substances Control Act (TSCA) for certain chemical substances that were the subject of premanufacture notices (PMNs) and are also subject to an Order issued by EPA pursuant to TSCA. The SNURs require persons to notify EPA at least 90 days before commencing the manufacture (defined by statute to include import) or processing of any of these chemical substances for an activity that is designated as a significant new use in the SNUR. The required notification initiates EPA's evaluation of the conditions of that use for that chemical substance. In addition, the manufacture or processing for the significant new use may not commence until EPA has conducted a review of the required notification; made an appropriate determination regarding that notification; and taken such actions as required by that determination.
Analyzed Economic Effects
6 provisions identified: 1 benefits, 5 costs, 0 mixed.
90‑Day Advance Notice to EPA Required
If you plan to manufacture, import, or process any of the listed chemical substances for a use the rule calls a “significant new use,” you must notify EPA at least 90 days before starting that activity by submitting a Significant New Use Notice (SNUN). You cannot begin the manufacture or processing for that significant new use until EPA reviews the SNUN and makes the required determination.
SNUN Submission Fees and Preparation Costs
Preparing and submitting a SNUN is estimated to cost about $45,000 for large business submitters and about $14,500 for qualifying small business submitters. The user fee component is $37,000 for standard submitters or a reduced user fee of $6,480 for qualifying small businesses.
Numeric Workplace and Emissions Controls Specified
The SNURs set specific workplace and emissions controls for certain substances, including respirator Assigned Protection Factors (APF) such as APF ≥1,000 (or APF ≥50 in some cases), APF ≥10,000 for edge oxidized graphene, an exposure monitoring threshold of 0.01 mg/m3 (8‑hour TWA) for one substance, a new chemical exposure limit (NCEL) of 0.00733 mg/m3 (8‑hour TWA) as an alternative for graphene, and emissions control efficiencies like ≥99.8% capture and control and incineration ≥99.999% efficiency; some substances trigger a significant new use if processed above 5% in formulation.
Recordkeeping and Time Burden for SNUNs
If you submit a SNUN, the paperwork burden to prepare and submit it is estimated to average between 30 and 170 hours per submission. Recordkeeping requirements in the rule also apply to manufacturers, importers, and processors of each listed substance.
Export Notification One‑Time Cost
If you export a substance covered by these SNURs, you must send a one-time export notification to EPA the first time you export or intend to export that substance to a particular country. EPA estimates the per-notification cost at about $106.
Cutoff Date for Ongoing Uses and RFA Certification
EPA set November 3, 2025 as the cutoff date to decide whether a use was ongoing; uses that were already ongoing as of that date would not be designated as significant new uses. EPA also certified under the Regulatory Flexibility Act that the rule will not have a significant economic impact on a substantial number of small entities.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-22082, Additional Reconsideration Standards of Performance for New, Reconstructed, and Modified Sources and Emissions Guidelines for Existing Sources: Oil and Natural Gas Sector Climate Review
The EPA is updating rules for oil and natural gas companies to fix issues from last year’s changes. They’re scrapping the Super Emitter Program, splitting well sites into clearer groups, and tweaking rules on leaks, equipment, and inspections. Companies should get ready to comment by December 16, 2026, as these updates could affect how they manage emissions and operate equipment.
2026-21155, Renewable Fuel Standard (RFS) Program: Reallocation of Additional 2025 Small Refinery Exemptions
The EPA is updating how it handles small refinery exemptions (SREs) for 2025 under the Renewable Fuel Standard. They’re deciding whether to spread the extra exemptions between 2026 and 2027 or give them all to 2027. This change might also push back the 2026 compliance deadline, affecting refiners and renewable fuel producers with potential timing and cost impacts.
2026-20849, Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes To Reflect Administration Policy
The EPA is giving facilities more time to meet new Clean Water Act rules for handling hazardous spills, pushing back the deadline to help them get ready. They’re also removing mentions of climate change and environmental justice to match new government policies. This delay helps facilities plan better without rushing and lets the EPA rethink the rules if needed.
2026-19071, Partial Repeal of the Carbon Pollution Standards for Fossil Fuel-Fired Electric Generating Units
The EPA is rolling back most of the 2024 rules that limited carbon pollution from fossil fuel power plants. This change affects coal and gas plants by easing some strict limits on emissions and carbon capture technology. The new rules kick in on November 16, 2026, potentially saving money for power plants but raising questions about pollution control.
2026-19072, Rescission of the Greenhouse Gas Findings for Fossil Fuel-Fired Power Plants and Repeal of Regulations for Power Plant Greenhouse Gas Emissions Under Clean Air Act Section 111
The EPA is proposing to cancel all greenhouse gas rules for fossil fuel power plants, saying the law doesn’t let them regulate these emissions for climate reasons. This change affects power plants across the U.S. and could impact future pollution limits and costs. Comments on this proposal are open until November 2, 2026, so now’s the time to speak up!
2026-18317, Updated Definition of “Waters of the United States”
The purpose of this supplemental notice of proposed rulemaking is for the U.S. Environmental Protection Agency (EPA) and the Department of the Army ("the agencies") to supplement and seek additional comment on certain aspects of an earlier proposal, published on November 20, 2025, to revise the regulations defining the scope of waters federally covered under the Clean Water Act in light of the U.S. Supreme Court's 2023 decision in Sackett v. Environmental Protection Agency. As stated in the agencies' November 20, 2025 Notice of Proposed Rulemaking (NPRM), the agencies intend for this rulemaking to provide greater regulatory certainty and increase Clean Water Act program predictability and consistency by clarifying the definition of "waters of the United States." After consideration of the public comments received on the NPRM, the agencies are issuing this notice to supplement the NPRM with additional regulatory options on certain aspects of the proposed rule.
Previous / Next Documents
Previous: 2026-17391, Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to the Duckabush Estuary Restoration Project in Washington
NMFS, upon request from the U.S. Army Corps of Engineers (USACE) issues this final rule pursuant to the Marine Mammal Protection Act (MMPA), to govern the taking of marine mammals incidental to the Duckabush Estuary Restoration Project (DERP) in Hood Canal, Washington over 5 years (2027-2032). This final rule, which allows for the issuance of a 5-year letter of authorization (LOA) allowing for the incidental take of marine mammals during the described activities and timeframes, prescribes the permissible methods of taking and other means of effecting the least practicable adverse impact on marine mammal species and their habitat, and establishes requirements pertaining to the monitoring and reporting of such taking.
Next: 2026-17426, Iranian Transactions and Sanctions Regulations
Starting August 24, 2026, the U.S. Treasury is pausing five special permissions that let people and businesses do certain things with Iran. This change affects anyone using these licenses, especially in education and trade, due to new U.S. policies responding to Iran’s actions. The pause is indefinite, so folks should check for updates before making deals or plans involving Iran.