2026-19549NoticeWallet

Air Force's Stuck Radioactive Source Triggers NRC Safety Overhaul Deal

Published Date: 9/24/2026

Notice

Summary

The Nuclear Regulatory Commission made a deal with the Department of the Air Force to fix safety issues after a stuck radioactive source incident at Kirtland Air Force Base. The Air Force promised to improve safety checks, update procedures, and boost safety culture. These changes started right away with no extra costs announced.

Analyzed Economic Effects

4 provisions identified: 1 benefits, 3 costs, 0 mixed.

Maintenance Restricted to Licensed Personnel

Within 180 days and via a license amendment, the Air Force must ensure annual inspection and maintenance for the AFRL irradiator are performed by persons specifically authorized (licensed) by the NRC or an Agreement State, and the license will be updated to describe irradiator activities that only licensed persons may perform. This requirement also directs the Air Force to revise maintenance procedures, require sign-offs for work, and update work logs within 180 days.

Security Plans and Training Must Be Updated

Within 90 days, all permittees subject to 10 CFR part 37 must revise Security Plans to include guidance on temporary security measures, and within 90 days must update required security training to include lessons learned from the 2024 event and topics such as security equipment loss and staffing needs. By 180 days, permittees must document temporary compensatory security measures for applicable emergency procedures.

Safety-Culture Notices and Training Required

Within 365 days, the Air Force must distribute a notice to each permittee, Permit Radiation Safety Officer (PRSO), Alternate PRSO (APRSO), employees and contractors describing the 2024 stuck-source event (including that the source remained stuck for 5 additional months) and must incorporate elements of the NRC's Safety Culture Policy into DAFMAN 40-201 and require training on updated Safety Culture expectations for PRSOs, APRSOs, and staff. The Air Force must verify that permittees have reviewed the notice within that 365-day period.

Emergency Cable System Inspections and Testing

Within 180 days, the Air Force must establish procedures to (1) annually inspect the Emergency Cable System to verify condition and configuration per the device safety evaluation, (2) establish a testing protocol based on the service provider's recommendations and prior inspection results, and (3) test the Emergency Cable System any time the cable is disconnected and reconnected.

Personalized for You

How does this regulation affect your finances?

Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.

Key Dates

Effective Date
Published Date
9/14/2026
9/24/2026

Department and Agencies

Department
Independent Agency
Agency
Nuclear Regulatory Commission
Source: View HTML

Related Federal Register Documents

Previous / Next Documents

Back to Federal Register