EPA Expands Texas Ocean Dump Sites for Dredged Gunk
Published Date: 9/28/2026
Rule
Summary
The EPA is expanding ocean spots off Corpus Christi, Texas, where dredged material can be safely dumped. This change helps local dredging groups, like the U.S. Army Corps of Engineers, keep waterways clear while protecting marine life. The new rules kick in on October 28, 2026, with ongoing monitoring to keep the ocean healthy.
Analyzed Economic Effects
3 provisions identified: 1 benefits, 1 costs, 1 mixed.
Expanded ocean disposal areas offshore
The EPA expanded two ocean dredged material disposal sites offshore of Corpus Christi. The Corpus Christi Ship Channel (CCSC) site increases from 0.61 to 1.05 square nautical miles and the Corpus Christi New Work (CCNW) site increases from 1.39 to 5.57 square nautical miles; the sites lie about 1.7 to 2.7 nautical miles offshore in water depths of about 35 to 55 feet. The sites are expected to provide ongoing disposal capacity for projects including the Port of Corpus Christi Channel Deepening Project (CCSCIP) and the Channel Deepening Project (CDP), which the document notes involve tens to hundreds of millions of cubic yards of dredged material (e.g., CCSCIP: ~41 million cubic yards new work and ~208 million cubic yards maintenance; CDP: ~46 million cubic yards new work and ~7.8 million cubic yards maintenance).
Disposal still requires EPA/USACE testing and permits
The expansion does not itself authorize ocean dumping. Before any person may dump dredged material at the CCSC or CCNW sites, the U.S. Army Corps of Engineers (USACE) and EPA must evaluate the dredged material under the marine protection criteria at 40 CFR part 227, and USACE must authorize the disposal under section 103 of the Marine Protection, Research and Sanctuaries Act (33 U.S.C. 1413(b)); EPA may concur with conditions or decline to concur. Only material determined suitable under those procedures may be disposed at the sites.
Sites subject to SMMP and periodic monitoring
The modified disposal sites will be managed under an updated Site Management and Monitoring Plan (SMMP) and will be monitored periodically (the EPA and USACE will continue periodic environmental monitoring approximately every 10 years). Monitoring includes water, sediment and elutriate chemistry, bioassays, bioaccumulation studies, benthic infauna analyses, and geophysical surveys, and all parties using the sites must follow project-specific conditions and SMMP provisions.
Personalized for You
How does this regulation affect your finances?
Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.
Key Dates
Department and Agencies
Related Federal Register Documents
2026-22082, Additional Reconsideration Standards of Performance for New, Reconstructed, and Modified Sources and Emissions Guidelines for Existing Sources: Oil and Natural Gas Sector Climate Review
The EPA is updating rules for oil and natural gas companies to fix issues from last year’s changes. They’re scrapping the Super Emitter Program, splitting well sites into clearer groups, and tweaking rules on leaks, equipment, and inspections. Companies should get ready to comment by December 16, 2026, as these updates could affect how they manage emissions and operate equipment.
2026-21155, Renewable Fuel Standard (RFS) Program: Reallocation of Additional 2025 Small Refinery Exemptions
The EPA is updating how it handles small refinery exemptions (SREs) for 2025 under the Renewable Fuel Standard. They’re deciding whether to spread the extra exemptions between 2026 and 2027 or give them all to 2027. This change might also push back the 2026 compliance deadline, affecting refiners and renewable fuel producers with potential timing and cost impacts.
2026-20849, Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes To Reflect Administration Policy
The EPA is giving facilities more time to meet new Clean Water Act rules for handling hazardous spills, pushing back the deadline to help them get ready. They’re also removing mentions of climate change and environmental justice to match new government policies. This delay helps facilities plan better without rushing and lets the EPA rethink the rules if needed.
2026-19071, Partial Repeal of the Carbon Pollution Standards for Fossil Fuel-Fired Electric Generating Units
The EPA is rolling back most of the 2024 rules that limited carbon pollution from fossil fuel power plants. This change affects coal and gas plants by easing some strict limits on emissions and carbon capture technology. The new rules kick in on November 16, 2026, potentially saving money for power plants but raising questions about pollution control.
2026-19072, Rescission of the Greenhouse Gas Findings for Fossil Fuel-Fired Power Plants and Repeal of Regulations for Power Plant Greenhouse Gas Emissions Under Clean Air Act Section 111
The EPA is proposing to cancel all greenhouse gas rules for fossil fuel power plants, saying the law doesn’t let them regulate these emissions for climate reasons. This change affects power plants across the U.S. and could impact future pollution limits and costs. Comments on this proposal are open until November 2, 2026, so now’s the time to speak up!
2026-18317, Updated Definition of “Waters of the United States”
The purpose of this supplemental notice of proposed rulemaking is for the U.S. Environmental Protection Agency (EPA) and the Department of the Army ("the agencies") to supplement and seek additional comment on certain aspects of an earlier proposal, published on November 20, 2025, to revise the regulations defining the scope of waters federally covered under the Clean Water Act in light of the U.S. Supreme Court's 2023 decision in Sackett v. Environmental Protection Agency. As stated in the agencies' November 20, 2025 Notice of Proposed Rulemaking (NPRM), the agencies intend for this rulemaking to provide greater regulatory certainty and increase Clean Water Act program predictability and consistency by clarifying the definition of "waters of the United States." After consideration of the public comments received on the NPRM, the agencies are issuing this notice to supplement the NPRM with additional regulatory options on certain aspects of the proposed rule.
Previous / Next Documents
Previous: 2026-19743, Section 108 Loan Guarantee Program: Announcement of Fee To Cover Credit Subsidy Costs for FY 2027
Starting October 28, 2026, borrowers using HUD’s Section 108 Loan Guarantee Program will see the fee to cover loan costs jump from 0.58% to 1.05%. This change helps HUD manage the risks and keep the program running smoothly for communities. If you’re planning to borrow under this program in Fiscal Year 2027, get ready for a slightly higher fee.
Next: 2026-19751, Airworthiness Directives; The Boeing Company Airplanes
If you own or operate Boeing 777 airplanes, listen up! The FAA found a fire risk from a motor pump that can overheat in the landing gear area. Starting November 2, 2026, you’ll need to check records or inspect these pumps, fix any problems, and stop installing the risky parts to keep flights safe and sound.