Washington Construction Can Disturb Marine Mammals, With Rules Attached

Published Date: 11/17/2026

Rule

Summary

The Washington State Parks and Recreation Commission got the green light to do construction work on marine facilities in North Puget Sound from 2026 to 2031. This work might accidentally disturb some marine mammals, but strict rules are in place to keep harm to a minimum and protect their homes. The project balances progress with care, ensuring marine life stays safe while upgrades happen.

Analyzed Economic Effects

3 provisions identified: 1 benefits, 2 costs, 0 mixed.

New on-site mitigation and monitoring requirements for contractors

If you are a contractor working on these projects, you must follow strict mitigation and monitoring rules: use NMFS-approved Protected Species Observers (PSOs) for all potentially takable activities; conduct visual monitoring starting 30 minutes before pile-driving and continuing 30 minutes after; implement soft starts for impact pile driving; operate bubble curtains during impact pile driving that cover 100% of the pile circumference with the bottom ring in full contact with the substrate; and observe shutdown zones and reporting requirements.

Construction limited to specific in-water windows and durations

Work must occur within Washington Department of Fish and Wildlife in-water windows and scheduled project years: Reid Harbor and Bowman Bay between September 1 and February 15 in LOA Year 1 (2026–2027) for up to 30 in-water days each; Prevost Harbor and Fossil Bay between September 1 and February 15 in LOA Year 2 (2027–2028) for up to 30 days each; Rosario Pier sometime between August 1 and February 15 in LOA Years 3 or 4 (2028–2030) for up to 10 in-water days; and Olga Pier between September 1 and February 15 in LOA Year 5 (2030–2031) for up to 30 days.

State Parks authorized to rebuild six marine facilities

You (visitors to Washington State parks) will see repairs and replacements at six marine facilities in North Puget Sound under the Marine Facilities Replacement Program. The rule authorizes construction at Reid and Prevost Harbors (Stuart Island), Fossil Bay (Sucia Island), Bowman Bay and Rosario Pier (Deception Pass), and Olga Pier (Olga State Park) between November 17, 2026 and November 17, 2031 to make facilities more accessible to visitors.

Personalized for You

How does this regulation affect your finances?

Personalize government policy and PRIA will tell you what this federal register document means for your household, plus every other regulation we track. PRIA reads each provision against your financial profile to show you exactly what matters to your wallet.

Key Dates

Published Date
Rule Effective
11/17/2026
11/17/2026

Department and Agencies

Department
Independent Agency
Agency
Commerce Department
National Oceanic and Atmospheric Administration
Source: View HTML

Related Federal Register Documents

Previous / Next Documents

Back to Federal Register