Nothing in 24.0115 through 24.0127 shall be construed to authorize the Commission to require the use of machinery, devices or equipment from a particular supplier or produced by a particular manufacturer if the required performance standards may be met by machinery, devices, or equipment otherwise available.
History: 1972, PL 12-45 § 1, 2000, PL 26-22.