New boilers and unfired pressure vessels — Fees

Ark. Code Ann. § 20-23-308 — under Boiler Safety.

Ark. Code Ann. § 20-23-308

(a) The following fees shall be paid before permits may be issued for the installation of any boiler or unfired pressure vessel:(1) Boilers:(A) Up to 200 horsepower, incl. $25.00(B) Over 200 horsepower $45.00(2) Unfired pressure vessels, including hot water storage containers $30.00

(1) Boilers:(A) Up to 200 horsepower, incl. $25.00(B) Over 200 horsepower $45.00

(A) Up to 200 horsepower, incl. $25.00

(B) Over 200 horsepower $45.00

(2) Unfired pressure vessels, including hot water storage containers $30.00

(b) The fee paid for the issuance of a permit for the installation of pressure piping shall be one hundred dollars ($100).